James Slade Log

From Open Source Ecology
Jump to navigation Jump to search

Thu Aug 8, 2013

edit

Wed August 7 2013

  • Conference call with Zach.
  • worked out a BOM for the controller
  • have a schematic drawn for the circuit
  • will compile the BOM tomorrow to get parts ordered.

Tue Aug 6 2013

edit


PCB Design

Design Rationale for Zach's CEB Controller -

  • Switch from automatic to manual mode - toggle
  • For drawer - you calibrate it and move it a certain percentage.
  • For drawer - end positions via pressure sensor
  • Replace pause with auto/manual switch


PCB of Board - [12]

Sunday August 4 2013

PCB designs

Sitting down and looking into PCB design for the CEB's. These will be professionally made to save time and also designed to be robust enough for outdoor, all weather use.

2 hours

Saturday August 3 2013

Log Start

  • Evaluate current requests from FeF and determine cost, time, and workflow
  • Setup Log

Had a late day getting started as there were unexpected issues here in moving my truck from Creation Flame to a shop in town. This will become 1983 Chevy Blazer 6.2 diesel mobile 4x4 power cube with a turbo. :)

Time Log

Time Sheet