Alec Log

From Open Source Ecology
Revision as of 17:32, 27 August 2015 by Alechiggins (talk | contribs)
Jump to navigation Jump to search

Active Projects

Hablab Exterior

08/27/2015

Siding on Hablab with Stefania.

Fed The Girls.

08/26/2015

Picked up Stefania from airport.

Fixed RH shower in Hablab (blocked head). Checked out LH shower, which is reversed; some more pex tubing and cinch clamps needed to fix it.

Picked up pickup from M&R.

Cleaned Hablab, laundry from Bulldozer Workshop

Loosened tree guard mesh where it was digging into bark on one tree, still needed on many others.

Picked apples

Fed The Girls


08/25/2015

Change bathroom propane tank at Hablab

Siding with Gary, Chris and Squires

Van breakdown, tow and repair (broken serpentine belt)

Take Kiran & Matthieu to KC

08/17/2015 - 08/24/2015

Bulldozer Workshop

08/16/2015

Hackaday Prize Log Update


08/15/2015

Change bathroom propane tank at Hablab

Workshop


08/14/2015

Hablab tidy-up

Preparing beds for fall garden

Workshop tidy-up

Clean contacts on van battery, replace bolt

Pick up steel at Shweiger

Unload steel

Walmart shopping run

Pick up workshop participants at airport and train station


08/13/2015

Workshop tidy-up

Meeting with MJ, CM re: bulldozer workshop

Walk-through of Hablab exterior with Gary

Drop off truck at M & R Auto

Add project log update to hackaday.io prize entry.

08/08/2015

Hackaday Prize Entry


Tue Aug 4, 2015

Alec Entrepreneur in Residence Agreement - [1]. Alec Work Plan - [2]