Kit Build Manual

From Open Source Ecology
Revision as of 16:10, 5 November 2018 by Marcin (talk | contribs) (→‎Tooling)
Jump to navigation Jump to search



Optimal Build Times

  • Titan Aero - 45 min - 1 hr according to online manual - [1]
  • Rod Cutting
  • Electronics Testing -


Tooling

  • Angle Grinder Chop Saw - [2]
  • Hack saw - 3D printed
  • 5 mm hex driver, #2 Philips, 3 mm flathead, #1 Philips
  • Pliers, .4 mm needle for clogs

Replacement Parts

  • E3D heat break - 1.75 mm - not cheap - [3]