Trellis Procedure Notes
Jump to navigation
Jump to search
- install first trellis. Use successive overlap. Trellis had 15 inch cuts, for 18" width total.
- Lag bolts every 1 foot. Started with 4-6 3" deck screws, right at top z flashing.
- First trellis started in northeast side. Put band on. But then band needed to be moved east due to successive overlap.
- Used triangle supports.
- Used blocking to support band 1.5" lower, but some places band was even with trellis.
- Used blocking on leading end of trellis as support and alignment for next trellis, to save on using triangle supports. Built 4 triangle supports sufficient for one side of house