Foundation Plumbing Inspection

From Open Source Ecology
Revision as of 07:16, 2 April 2022 by Marcin (talk | contribs)
Jump to navigation Jump to search
  • There may be an inspection during the foundation phase.

Notes:

  • 5 lb pressure on a gauge with 0.1 PSI increments per IRC P2503.9 [1]

Sourcing

  • See spreadsheet for SEH 2 [2]