SH4 Future Work

From Open Source Ecology
Revision as of 20:57, 22 January 2023 by Marcin (talk | contribs)
Jump to navigation Jump to search

SH4 Future WorkSH4 Challenges

  • Under stair closet door - redesign for modularity
  • Wiring - SH4 has entrance at back left corner. Do a high power panel (100A)for induction, water heater. Do subpanel for light circuits (100A CSED) with meter bypass (using it only as a subpanel). Explore possibility of PoN subpanel. Does this exist?