Integrated Scaling Strategy
Jump to navigation
Jump to search
Core
- $25k vs 120k labor - 4.8x lower labor cost based on OSE Build Cost.
- Formula: we give back 50% to the customer in added value, and 50% for the larger open source economy transition
Unique Features
- Integrated tools vBOM
- Tool manufacturing
- Materials Manufacturing