Apprenticeship Development Log

From Open Source Ecology
Revision as of 17:53, 20 May 2025 by Marcin (talk | contribs) (Created page with "=Tue May 20, 2025= #Dozer rental for 20k sf building. Start BOM + design. Gravel cost - 1000 sf takes 1 truck at 4" =17.5 ton")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Tue May 20, 2025

  1. Dozer rental for 20k sf building. Start BOM + design. Gravel cost - 1000 sf takes 1 truck at 4" =17.5 ton