Build Wheel Shafts

From Open Source Ecology
Revision as of 01:45, 19 June 2011 by Marcin (talk | contribs) (Created page with "*Cut 1-7/8" shafts to 28" *Cut 6" long collars from 2" pipe *Label collar and shaft, as these are paired up and can't be confused between shafts. *Drill 3/4" hole for wheel plate...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
  • Cut 1-7/8" shafts to 28"
  • Cut 6" long collars from 2" pipe
  • Label collar and shaft, as these are paired up and can't be confused between shafts.
  • Drill 3/4" hole for wheel plate mounting through shaft and collar
    • Drill through collar and shaft at the same time
  • Weld on reinforcing nuts on collars
  • End drill 3.5" deep (on a lathe) the 1-3/8" receiver for 6-spline standard PTO shafting