Instructionals To Do List
Jump to navigation
Jump to search
To be taken up by Ian Midgley
- Fabrication o of sensor units for CEB press from raw components to encapsulated sensor
- Fabrication steps for soil loading drawer
- Edit of assembly procedure for entire frame, starting from components
- Building hopper shaker assembly
- Building of hopper superstructure and connection to frame
- Asembly and function of cylinder ajusters: forward, side to side, and drawer adjusters
- Documentation of CEB machine dimensions, piece by piece
- Hydrauilics hookup and operation procedure
- Brick pressing sequence explanation
- Sawmill: operation procedures from existing footage
- Tractor: wheel attachment procedure
- Tractor: loader mounting procedure
- Power Cube: overall assembly procedure starting from raw parts
- Soil pulverizer: overall assembly procedure
- Power Cube: wiring walkthrough
- CEB press: field operating procedure from setup to bricks pressed