Surveying 101

From Open Source Ecology
Jump to navigation Jump to search
  • Contractor's site level: Home Depot $240 - shoots vertical intervals - drop in stairstep. Vertical intervals are equal unless there is huge variation in slope.
  • 2 foot drop standard. May need to 4' at high slope like 10%.
  • Weedwhacker + chainsaw. Offset 10' from trees if trees are in the way.
    • Always go in one direction.
    • Need a scale map of property.
  • Procedure: Shoot vertical intervals first (slope). Set up horizontal intervals (following contours, creates aspect) later. Then put the grid down.

Design

  • Chapter 2-3 Mollison - erosion pattern - dendritic pattern

Design: 5% slope not good for animals, west face not good.

Ask Parker on full soil report.