Marcin Log 12/19/11 - 12/31/11

From Open Source Ecology
Revision as of 12:15, 1 October 2012 by Marcin (talk | contribs) (Created page with "=12/31/11= *January Milestone and Strategy Brief =12/30/11= *Published [http://blog.opensourceecology.org/2011/12/calling-all-disruptive-boundary-smashing-distributive-enter...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

12/31/11

12/30/11


12/29/11

  • Open Source Ecology Enterprise Plan for 2012


  • OSE Enterprise platform for fostering of economic best practices
  • Explanation of OSE, GVCS and phases needed for success
  • Summing up of work done in 2011
  • Month-by-month development roadmap of 2012 OSE Goals, including projected costs

12/24/11

  • CEB Operational Safety--An Introduction


  • Proper safety for operating the CEB
  • Safety is critical for this BETA RELEASE of the CEB Press despite 150+ hours of field testing
  • Recommend to work in pairs or teams, proper protection needed, heavy-machine experience needed
  • Step-by-Step safety instructions from Marcin for anyone operating the CEB Press


  • Lifetrac Tractor Operation, Safety, Maintenance, Troubleshooting, and Repair Introduction


  • Proper safety for operating the Lifetrac Tractor
  • Safety is critical for this BETA RELEASE of the Lifetrac despite 150+ hours of field testing
  • Recommend to work in a pair or as a team--not alone, proper protection needed, heavy-machine experience needed
  • Step-by-Step safety instructions from Marcin for anyone operating the Lifetrac
  • Basic Tractor operation techniques


  • Soil Pulverizer Operation, Safety, Maintenance, Troubleshooting, and Repair Introduction


  • Proper safety for operating the Soil Pulverizer
  • Safety is critical for this BETA RELEASE of the Soil Pulverizer despite 150+ hours of field testing
  • Recommend to work in a pair or as a team--not alone, proper protection needed, heavy-machine experience needed
  • Step-by-Step safety instructions from Marcin for anyone operating the Soil Pulverizer
  • Basic Soil Pulverizer operation techniques and best practices



  • Power Cube Operation, Safety, Maintenance, Troubleshooting, and Repair Introductions


  • Proper safety for operating the Power Cube
  • Safety is critical for this BETA RELEASE of the Power Cube despite 150+ hours of field testing
  • Recommend to work in a pair or as a team--not alone, proper protection needed, heavy-machine experience needed
  • Step-by-Step safety instructions from Marcin for anyone operating the Power Cube
  • Basic Power Cube operation techniques and best practices


  • Construction in Progress - Results of 2011


  • Summary of results for 2011
  • Significant CEB construction completed in 2011 with HabLab (which is almost complete)
  • Prototyping being done in workshop
  • Explanation, philosophy, materials, outcomes and successes of CEB Construction
  • Successful use of CEB Press and Soil Pulverizer
  • Unsuccessful with cinder-block replacement pressing with reject Lime
  • Explanation of overall brick-pressing, brick-laying and mortaring experience and construction techniques discovered while building the HabLab

12/23/11

  • Quick Attach Wheel Assembly Walk-through*


  • Walk-through explanation of detachable quick-attach wheel motor unit for heavy-duty machines
  • motor, bolts, structure, hub, splined, shaft, couplers, collars, washers, bearings, Lifetrac frame,
  • HabLab Dec 23 overview
  • HabLab Dec 23 overview 2

12/22/11


12/21/11

  • Quick Attach Wheel 1*


12/19/11