FeF Prototyping Schedule 2013
Jump to navigation
Jump to search
Q2
- Product Lead, Documenter, Tech Community Manager, Ops Manager, recruited by April 1 - on board by June 17, 2013. June 17 - first meeting with Marcin, Katie, Audrey, Gary, and Rob on board full time. As people are getting on-boarded, the 6 in 60 Campaign is ongoing. See 6 in 60 Milestones for assessment of achievable goals.
The 3 month campaign for 2013 for Q3
- Following 6 in 60 of Q2 - our goal is to master the rest of the mechanical infrastructures, which are based on steel and hydraulics - as relevant to agricultural and construction infrastructures. The tools covered i
CNC Torch table
- (April 26-28 - OSHW Hackberry Jam)
- (May 2-4 - Seoul Digital Forum)
- May 10-11 - Bulldozer + geardown + blade + weights modules
- May 17-18 - CNC Circuit Mill + 3D Printer
- May 24-25 - Open Source Laser Cutter
- Jun 1-2 - Large Power Cube module - 150 hp
- Jun 7-8 - OS Car
- Jun 14-15 - Ironworker redesign for fabrication
- Jun 21-22 - Open Source MIG Welder power supply, OS wire feed, OS Gas feed, to standard gun.
With CNC Torch Table, Ironworker, and Welder power supply, we can fabricate rapidly.