Chris Bassett Log

From Open Source Ecology
Jump to navigation Jump to search

Chris Bassett Log

7/13/2013 Design Sprint. Set Goals to work out details of acetylene/oxygen controls between tanks and torch head (Gas Delivery System). Review mechanics of slider gantries on table in solidworks for design considerations.

7/15/2013

Learned out to work GIT HUB to access file repositories. Need to download application. A tutorial can be found here: https://help.github.com/articles/fork-a-repo

The application can be found here: https://help.github.com/articles/set-up-git

Checked that the solid works file loaded - successful. Will review in detail later

Researched Prior Work. Will build upon prior torch mounting systems of hose clamps holding a modified torch head. Learned the stepper motors move the gantry using rack and pinions.

The prior flying gantry used two rails in parallel to stabilize rotation. From the model, v2 of the Torch the flying gantry will slide on one rail so some suitable bracking will need to happen.

Gantry v1.jpg Gantry v2.jpg Changes to consider in tool head design.

Standards for oxy-acetylene systems: Threading is 1/4 NPT, LH threading for acetylene connections. Valves should be "grease-less" for prevention of combustible contaminants

Solenoid For Cutting Oxygen Flow: http://www.mcmaster.com/#standard-brass-solenoid-valves/=nmzf4c


7/16/2013

Created this to work off of and explain how the torch head functions (and to start filling in a BOM)

Torch head.jpg

Got solenoid voltage from Paul Log. Actuation will be 24 volts coming from the heater circuit of the RAMPS board. Will need to check the current draw...