Daily Product Development Meeting

From Open Source Ecology
Jump to navigation Jump to search

Production



Logs

Current Product Development

Backhoe

Ironworker

LifeTrac 6

Microhouse

Production Meeting Notes

7 Oct 2013

Agenda: 1) Backhoe Status, 2) Ironworker Status, 3) Microhouse Status, 4) Documentation

Backhoe

  • Goal: Decide design vector for pivot by COB today via Tech Tree of Choices; begin 3D modeling of Design in Sketchup
  • Backhoe Pivot:
    • Using Laser cutter pieces to build a small scale pivot (blog input & newsletter topic)
    • Dan & Cody created a viable option that will give us 160 degrees of motion (goal is 180 degress -- 90 degrees on each side)
    • Industry standard includes additional control mechanisms on the side of the pivot to allow for additional ROM
    • Need to complete a Tech Tree of Choices to determine path forward
    • Need to use LibreCAD to do a quick 2D analysis of ROM
    • Does 180 degree ROM apply to industry standard Backhoes that do not use a gearbox? What ROM do they get?
    • Discussion on custom work: may integrate minor custom work into design to allow for greater ROM; need to include these as options for analysis of complexity
  • Backhoe Bucket:
    • Need to determine proper pin mounting


Ironworkwer


Microhouse

  • Microhouse: Need to finish roof...work this into Ironworker / Backhoe schedule; get additional manpower to assist with this from temp agency


Documentation

  • Trovebox - DPVs will need to use Rob's login to upload from smartphones; Account: opensourceecology.trovebox.com; Username: Rob@opensourceecology.org; PW: verdel1
    • Need to create a DPV General User account so staff accounts are not compromised
    • Need to provide feedback to Trovebox for improvement; we are part of a beta-test...need to include youtube, vimeo, Dozuki access, LibreCAD for simple 2D design -- need instructionals


Other

  • Emmett is likely leaving Saturday or Sunday

Production Rhythm

Monday

  • Enterprise Program Review
  • Review Design Sprint Product(s)

Tuesday

  • Logistics
    • Shop Equipment Status
    • Repair Status
    • Supply Status - Long Lead Parts, High Risk Parts
    • Other Logistics Issues

Wednesday

  • Issues & Risks

Thursday

  • Schedule