Daily Product Development Meeting
Jump to navigation
Jump to search
Production
Logs
Current Product Development
Backhoe
Ironworker
LifeTrac 6
Microhouse
Production Meeting Notes
7 Oct 2013
Agenda: 1) Backhoe Status, 2) Ironworker Status, 3) Microhouse Status, 4) Documentation
Backhoe
- Goal: Decide design vector for pivot by COB today via Tech Tree of Choices; begin 3D modeling of Design in Sketchup
- Backhoe Pivot:
- Using Laser cutter pieces to build a small scale pivot (blog input & newsletter topic)
- Dan & Cody created a viable option that will give us 160 degrees of motion (goal is 180 degress -- 90 degrees on each side)
- Industry standard includes additional control mechanisms on the side of the pivot to allow for additional ROM
- Need to complete a Tech Tree of Choices to determine path forward
- Need to use LibreCAD to do a quick 2D analysis of ROM
- Does 180 degree ROM apply to industry standard Backhoes that do not use a gearbox? What ROM do they get?
- Discussion on custom work: may integrate minor custom work into design to allow for greater ROM; need to include these as options for analysis of complexity
- We have 8" and 10" cylinders; but they may not have the correct diameter cylinders; may need between 8-12" -- let's order what we need today
- Backhoe Bucket:
- Need to determine proper pin mounting
Ironworkwer
- Will table Ironworker discussion with Marcin and roll into schedule
Microhouse
- Microhouse: Need to finish roof...work this into Ironworker / Backhoe schedule; get additional manpower to assist with this from temp agency
Documentation
- Trovebox - DPVs will need to use Rob's login to upload from smartphones; Account: opensourceecology.trovebox.com; Username: Rob@opensourceecology.org; PW: verdel1
- Need to create a DPV General User account so staff accounts are not compromised
- Need to provide feedback to Trovebox for improvement; we are part of a beta-test...need to include youtube, vimeo, Dozuki access, LibreCAD for simple 2D design -- need instructionals
- New documentation method -- 1) Explode the diagram; 2) Play it in reverse to create a dis-assembly to assembly using animation (i.e. the Phoenix Method w/ animation). Issue: capturing the animation on screen; need to work this out (Rob will work this and get back to us). If it works, they will try the cab.
Other
- Emmett is likely leaving Saturday or Sunday
- Time off
- Workshop cleanup
- Media focus this week: Rapid prototyping capability using laser cut pieces
Actions:
- Work on animation and sequencing for documentation purposes and work out our methodology -- Rob & Emmett
- Tech tree of choices for pivot -- Cody
- Build pivot in LibreCAD for 2D ROM analysis -- Dan
- Cylinders: Marcin will order if needed
- Shop cleanup -- ALL prior to workshop work today
Production Rhythm
Monday
- Enterprise Program Review
- Review Design Sprint Product(s)
Tuesday
- Logistics
- Shop Equipment Status
- Repair Status
- Supply Status - Long Lead Parts, High Risk Parts
- Other Logistics Issues
Wednesday
- Issues & Risks
Thursday
- Schedule