  • Note- motor is 12 gpm continuous, so must be activated in parallel with other element or flow reduced
  • Advanced flow reduction strategy - running other components in parallel
  • specific speeds and flows must be calibrated
  • motor is rated for 1800 psi, so pressure reducer must be used
  • for 14 gpm - can use small cylinder motion to reduce flow, or just needle valve.
  • for 28 gpm must have 3 solenoids going at once for shaker not to blow up
  • cushion valve must be used in all cases
  • p spike upon startup is an issue - needs to be tested - data collection - ie - pressure spike upon startup
  • to test cushion valve, observe pressure with pressure valve in manual mode
  • next steps - use log splitter 2 stage pump for faster pressing