Parallel Production Engineering

From Open Source Ecology
Revision as of 13:51, 25 January 2017 by Marcin (talk | contribs) (Created page with "This is a document specifying procedure/timing of when different modules of the build are to occur. This must be based on: *Number of different modules *Completion time of eac...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

This is a document specifying procedure/timing of when different modules of the build are to occur. This must be based on:

  • Number of different modules
  • Completion time of each module
  • Module complexity
  • Number of people doing the build
  • Tools available for the build and their condition
  • Supplies available for the build
  • Skill level of participants
  • Infrastructure and facility access
  • Safety during the build process
  • Optimal timing during the day
  • External factors such as weather. For example, in rainy whether, fetching supplies from outside may be an issue.
  • Energy level and morale of the build team
  • Amount of leadership, guidance, and automation available