GVCS 50/2/2

From Open Source Ecology
< GVCS 50
Revision as of 07:23, 29 March 2011 by Marcin (talk | contribs)
Jump to navigation Jump to search

This is the log of an evolving strategic development plan for GVCS 50/2/2 - the goal of completing the GVCS in 2 years within a $2M budget. First, look at the GVCS 50 - the 50 tools of the Global Village Construction Set (GVCS). *See GVCS Tools Status for development status by prototype (1-3) and by 31 steps for completing each prototype.

Proposed Timeline

  • Production run at Factor e Farm - April 4, 2011 - May 31
    • Expected bootstrap funding of about $30k by June 1
  • Kickstarter campaign for the Open Source Microfactory- April 14, 2011
    • Expected deliverables: $100k of funding by June 1
  • Full Product Releases: Tractor, Pulverizer, and second prototype of Torch Table, by June 1, see Product Ecologies
  • Prioritized order of development:
    • Microfactory Prototype Cycle - by Sep 1, 2011 - 13 ongoing prototypes (

File:Openfarmtech.org.nyud.net/weblog/wp-content/uploads/2011/03/microfactory-sm.jpg

    • Factor e Farm

Requirements

  • There are 6 major project groups:
    • Open Source Microfactory - all of the fabrication tools
    • Open Source Tractor Infrastructure - mechanical infrastructure and implements
    • Steam Engine Infrastructure - Steam Engine, Steam Generator, Gasifier Burner, Pelletizer
    • Solar Concentrator - an advanced system integrating tracking, precision fabrication, and steam engine components
    • Extraction of Aluminum from Clay
  • Current Budgets