GVCS Organizational Status

From Open Source Ecology
Revision as of 18:39, 6 April 2011 by Marcin (talk | contribs)
Jump to navigation Jump to search

Note to project managers: This page should serve as a one-page master index to all technical development, and each status entry should be hyperlinked to provide details. Note that each entry is scored 1-10 for the level of completion, and there are 31 steps times 3 prototypes (different colors). That is a total of about 4.5k pages that will eventually be linked to this Status page. To help organize this page, each tool name should be linked to the Product Page Template See also GVCS tools

Task 1 2 3 4 5 6 7 8 9 10
Concept Leader Manager SME CAD Person Fabricator Marketer Documentor Standards Report Concept Design
Tractor 10 10 3 5