Operating Costs

From Open Source Ecology
Revision as of 20:51, 15 March 2021 by Marcin (talk | contribs) (Created page with "What are the operating costs for an OSE Campus? =Existing Facility= Costs are: *There are internet, electrical, water, sewer, and gas costs. *There is the cost of taxes *Road...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

What are the operating costs for an OSE Campus?

Existing Facility

Costs are:

  • There are internet, electrical, water, sewer, and gas costs.
  • There is the cost of taxes
  • Road maintenance
  • Site maintenance, mowing, building maintenance
  • Operations - materials for prototyping
  • Facility improvements - landscaping, planting, agriculture infrastructure, new buildings, terraforming, renewable energy, utility wire and pipe
  • Staff
  • Food