Trellis Procedure Notes

From Open Source Ecology
Revision as of 12:10, 23 December 2021 by Marcin (talk | contribs) (Created page with "*install first trellis. Use successive overlap. Trellis had 15 inch cuts, for 18" width total. *Lag bolts every 1 foot. Started with 4-6 3" deck screws, right at top z flashing.")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
  • install first trellis. Use successive overlap. Trellis had 15 inch cuts, for 18" width total.
  • Lag bolts every 1 foot. Started with 4-6 3" deck screws, right at top z flashing.