Seed Eco-Home 4 Future Work

From Open Source Ecology
Jump to navigation Jump to search

General Workflow

  • Logistics double the effort. 'production' must be extended to make-load for transport- load to allow correct build order straight from trailer. This way, production is paid for loading, and eliminates unloading - producing 3x productivity at the same cost. Avoids loading effort, unloading effort - which are integrated into the production side. Savings of 2x for comfortable production ergonomics on a work table.

Ergonomics

edit

Wash Sink