Interior Wall Build Process

From Open Source Ecology
Revision as of 21:34, 22 January 2023 by Marcin (talk | contribs) (Created page with "#Wall 1 - foundation 3" stub is level with foundation. Module 1 inserts into stub so main stack is connected upon installation of Module 1.")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
  1. Wall 1 - foundation 3" stub is level with foundation. Module 1 inserts into stub so main stack is connected upon installation of Module 1.