Integrated Scaling Strategy

From Open Source Ecology
Revision as of 19:00, 1 January 2024 by Marcin (talk | contribs) (→‎Core)
Jump to navigation Jump to search

edit


Core

  • $25k vs 120k labor - 4.8x lower labor cost based on OSE Build Cost.
  • Formula: we give back 50% to the customer in added value, and 50% for the larger open source economy transition

Unique Features

  • Integrated tools vBOM
  • Tool manufacturing
  • Materials Manufacturing