Utility Wall Design-Build

From Open Source Ecology
Revision as of 22:25, 4 May 2024 by Marcin (talk | contribs) (Created page with "Updated procedures for marking and production after framing is done without MEP - [https://docs.google.com/presentation/d/1s5gIvejTcUfIEs09uzhcOh4ygYemDaVosFLBqeiJIG0/edit#sli...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Updated procedures for marking and production after framing is done without MEP - [1]. This is the route in a low-skill environment when framing is done separately from MEP.

Note that the MEP-location magnets can be added in the module build phase in production. This is the preferred route in production, such that Quad Modules are produced as one step.