SEH 4 Final Coat Procedure

From Open Source Ecology
Revision as of 20:37, 15 September 2024 by Marcin (talk | contribs)
Jump to navigation Jump to search
  • Observe subfloor joists. Sand or caulk any final defects.
  • 310 shellac the bottom edges where needed
  • 45 degree shellac 515 into corners
  • Right angle to subfloor
  • Right angle to bottom vertical of joists.

Thus