SEH 4 Final Coat Procedure

From Open Source Ecology
Revision as of 20:46, 15 September 2024 by Marcin (talk | contribs)
Jump to navigation Jump to search
  • Observe subfloor joists. Sand or caulk any final defects.
  • 310 shellac the bottom edges where needed
  • 45 degree shellac 515 into corners
  • Right angle to subfloor
  • Right angle to bottom vertical of joists.

Thus, pattern is 5 passes per bay for 4 feet of surface, not counting 310 of bottom edges. 5 passes is just right on the conservative side, if each pass is actually counted as 6" wide effective width accounting for overlap. If effective width is 6, the number of passes would actually be 8.

Alt procedure:

  • 45 degree on the bottom
  • Bulk joist face
  • Corner
  • 3 underside of subfloor
  • Same on other side - corner, bulk face, bottom of joist.

This is actually 9 passes. Maybe cut the 3 on underside to 2.