Janyuary-February Goals for Torch Table
Jump to navigation
Jump to search
Introduction
As the workshop nears completion and the inside wall for the utility space is being put up, here are my commitments to the torch table, and CEB project, development.
Personally, I've been publishing the Factor e Live Distillations series - which is critical to laying the groundwork for OSE collaboration, so I prioritized it above the CEB fabrication torch table. This produced a month delay in the Torch Table.
CEB Press Deployment Timeline
- January 25 - rest and post these commitments, lay out plan for torch table; finish 3D design on Torch Table; publish Distillations Part 7
- 26, Mon - Picked up Nathan; basically finished bricking-in the utility area; worked till 8 PM - too late - as too tired next day
- 27 Tuesday - ordered passport pictures, worked on publicity material for 1000 Squared, got Nathan settled in; went food shopping to Jamesport; did Prototype one of open source v-grafting tool; edited publicity material for 1000 Squared from Matthew
- 28 Wednesday - composed initial 3D of torch table with Jeremy, updated sourcing info on Torch Table; prepared hot water tank; wrote part of Solar Turbine distillation
- 29 Thursday - continued transcript of Solar Turbine project by noon; Finished 3D torch table with Jeremy by 2; work on water tank - close in water tank, add fittings till 6 - worked till 7; need thread tape; did not publish BOM for torch table, for gantry
- 30 Friday - Publish Solar Turbine Distillation; get metal for sawmill and torch table from Sweiger; install water tank and run Babington in workshop
- 31 Saturday - post design for review to Jack C, DIY CNC group; sawmill, and steam engine;Clear out barrels and build torch table frame in greenhouse; Order bearings for torch table; Order gears for Torch table; Order bolts for torch table;Mount rail and gear rack on torch table - Install Linux, LinuxCNC, and Test Motors for Torch Table;publish Torch Table Marketing Plan ; Publish distillatins on OSE Business Model; Assemble torch table frame; order torch head; do Sawmill Project Distillation ublish Distillations on Solar Turbine project; Babington - me; Shower - rest of team; Publish Lathe design; Start assembling torch table gantry; Distillations on Marketing Plan
- February 1 - Rest day - Collaborative Development Process Distillation writing
- Feb 2, Monday - Begin assembling gantry; Summary of Distillations
- 3 - Gantry assembly day 2
- 4 - Gantry assembly day 3
- 5 - Gantry assembly day 4; end of Distillations Series
- 6 - Gantry assembly day 5
- 7 - Gantry assembly day 6 - *publish CEB marketing plan;
- 8 - Rest day
- Week 2 of February - Install bearings, xy and z drive system towards completion
- Week 3 of February - Torch table testing - dimensionally-correct torch holes in sample metal
- Week 4 of February - Tie up loose ends, begin CEB Prototype 2 with digital assist.
- March, Week 1 - Order other parts for Prototype 2, order hydraulic solenoid valves, implement Arduino solenoid control
- March, Week 2 - Build large hopper assembly
- March, Week 4 - test CEB press with automatic controls
- April, Week 1 - Test large hopper operation
- April, Week 2 - optimize fabrication with Prototype 3
- April, Week 4 - Integrate and document CEB system
- May 1 - 2009 - Begin taking orders