Surveying 101

From Open Source Ecology
Revision as of 02:15, 16 June 2012 by Marcin (talk | contribs)
Jump to navigation Jump to search

Contractor's site level: Home Depot $240 - shoots vertical intervals - drop in stairstep. Vertical intervals are equal unless there is huge variation in slope.

2 foot drop standard. May need to 4' at high slope like 10%.