Daily Product Development Meeting/Notes Oct 21-25
October 21-27
Fri, 25 Oct
Agenda: 1) Ironworker, 2) MH, 3) Infrastructure, 4) Logistics
- Ironworker -- Guides complete, working on table and clamping mechanism; need to design integration of the bushings for the cylinder -- GOAL -- test today!
- MH -- trimmed out windows, other trim is painted and ready for install, lower kitchen cabinets installed; all materials to continue the MH are in the workshop
- Infrastructure -- LaborMax digger is coming to expose the pipe
- Logistics -- need more gasoline; Katie will provide the DOV card for a fuel run
- Other -- Going to outline tasks for the Ironworker Design/Build/Document Sprint in Github today for tomorrow's sprint (Marcin & Dan)
Thurs, 24 Oct
Agenda: 1) Ironworker, 2) MH, 3) Infrastructure, 4) Logistics
- Ironworker -- building guides for the back of the ironworker for vertical alignment; Jeffrey S will work on the table as an RC; feet are done on the frame buildout--need to develop in Sketchup and integrate; Dan created an issue tracker for the Ironworker in Github
- MH -- Mark will be coming the next five days to complete the MH
- Infrastructure -- we will get another temp to expose drainpipe from HabLab to fix drainage issue
- Table -- Dan will show Marcin Github page he created for the Ironworker
- Iron @ Sweiger for 6 in 60 -- Marcin believes we have angle iron there that needs to be picked up;
- Discussion -- how to direct RCs to info on the wiki
Wed, 23 Oct
Agenda: 1) Backhoe development status; 2) Microhouse; 3) Ironworker
- Backhoe: One show-stopping problem: the tractor can't lift the backhoe -- t-shooting by focusing proper pressure in the power cubes
- Goal today is to do some test digs
- MH: Plumbed, electrical done; need to complete interior trim details; need to tile bathroom, flooring in the loft, and floor seal downstairs, touch up on outside stucco; we can use Mark for most of these things
- Ironworker: Need to develop product concepts for outstanding modules
- OTHER: 1) Trencher is now a priority for November -- need to reflow Product Dev Schedule and update dev priorities ASAP; 2) Dan to KC for personal appt today; 3) Need to return saws at Harbor Freight (note: can't find receipt, will need to get with Katie); drill to Menards (found receipt(s); pick up 10" bolts x 100, 1" flat washers x100, and 1" lock washers x 100 @ MoKan (note: called MoKan, they ordered the 9" bolts vs 10" bolts, they can have 10" bolts here on Friday, need to follow-up)
Wrap-up
- Cancelled
Tues, 22 Oct
No notes taken!
Mon, 21 Oct
No notes taken!