Marcinose YouTube
http://www.youtube.com/user/marcinose
Hint: This is an index of videos which may be used to supplement remote video editing. Note also the repo started in 2020 at Google Photos. An index has to be made for all of them on the wiki, as there is no way to display and share all Gmail videos publically at this time - you can only share one album at a time. We can thus create a wiki gallery of albums. Volunteer needed for this. There are 10,900 videos on Marcinose Youtube.
Also see http://opensourceecology.org/wiki/OpenSourceEcology_Vimeo
Habitat
CEB Press
- CEB Cyclinder Testing, 5 Nov 2007 - [1]
- CEB Cylinder Mounting, 26 Nov 2007 - [2]
- CEB Testing with Hopper, 26 Dec 2007 - [3]
- Advanced Compressed Earth Block Press Fabrication, 18 Jan 2008 - [4]
- CEB Cylinder Mounting Assembly Preparation, 18 Jan 2008 - [5]
- CEB Press Plate Box, 18 Jan 2008 - [6]
- Compressed Earth Block Press Press Plate Testing, 18 Jan 2008 - [7]
- CEB Cylinder Mounting in Frame, 18 Jan 2008 - [8]
- First Completed CEB Prototype Testing, 18 Jan 2008 - [9]
- First CEB Block Ejected, 18 Jan 2008 - [10]
- Factor e Live 8, Advanced CEB Press and Solar Panels, 3 Sep 2008 - [11]
- (Factor e Live 10) CEB Field Testing, 16 Oct 2008 - [12]
- Open Source CEB Press Production Test Runs, 5 Nov 2008 - [13]
- CEB Brick Production Day 1, 9 Nov 2008 - [14]
- 5000 Compressed Earth Bricks Pressed, 25 Nov 2008 - [15]
- CEB field report - 5691 bricks pressed, 27 Nov 2008 - [16]
- Populating the CEB addition, 29 Nov 2008 - [17]
- CEB Plan B - Snow flurries, 30 Nov 2008 - [18]
- First CEB Brick Laid, 2 Dec 2008 - [19]
- First CEB Wall Section, 3 Dec 2008 - [20]
- CEB Wall Growing, 8 Dec 2008 - [21]
- Mounting the trusses on the CEB building, 11 Dec 2008 - [22]
- CEB Addition Near Completion, 19 Dec 2008 - [23]
- Factor e Live Distillations (part 5) The CEB Story - To Build a Village, 16 Jan 2009 - [24]
- CEB, Hexacube, and Hexayurt, 23 Feb 2009 - [25]
- Green Roof, 26 Feb 2009 - [26]
- CEB Hopper Problem Statement, 26 Feb 2009 - [27]
- Hexacube 2, 5 Mar 2009 - [28]
- Liberator 2 function, 12 Apr 2009 - [29]
- CEB controller testing with secondary cylinder, 18/12/11 - [30]
- CEB Controller 2011, 27 Aug 2011 - [31]
- Compression Chamber Quality Control, 1 Sep 2011 - [32]
- CEB Hoppers, 6 Sep 2011 - [33]
- Finising CEB Hoppers, 7 Sep 2011 - [34]
- CEB Secondary Cylinder hydraulic Connection, 10 Sep 2011 - [35]
- CEB needle valve, 19 Sep 2011 - [36]
- Main CEB cylinder testing, 19 Sep 2011 - [37]
- Full CEB Automation with Detroit Fab Lab Solenoid Drivers, 19 Sep 2011 - [38]
- Speed control needle valve, 23 Sep 2011 - [39]
- Ceb column foundation rebar, 24 Sep 2011 - [40]
- CEB vault prototype, 28 Sep 2011 - [41]
- 1 Squaring CEB Drawer, 2 Oct 2011 - [42]
- 2 frame jig, 2 Oct 2011 - [43]
- 3 fitting cylinder, 2 Oct 2011 - [44]
- 4 frame and roller guide holes, 2 Oct 2011 - [45]
- 5 frame jig turning, 3 Oct 2011 - [46]
- 6 frame welding, 3 Oct 2011 - [47]
- 7 making bolts, 3 Oct 2011 - [48]
- 8 shims squaring drawer, 3 Oct 2011 - [49]
- 9 squaring hyd cylinder, 3 Oct 2011 - [50]
- 10 stretching the frame, 3 Oct 2011 - [51]
- 11 torching sensor holes, 3 Oct 2011 - [52]
- CEB finishing, 7 Oct 2011 - [53]
- Placing CEB press in position, 20 Oct 2011 - [54]
- Foundation plus positioning CEB in place, 21 Oct 2011 - [55]
- outer members, 21 Oct 2011 - [56]
- installing drawers, 22 Oct 2011 - [57]
- properly installed drawers, 22 Oct 2011 - [58]
- CEB Pressing setup, 22 Oct 2011 - [59]
- Brick pressing under way, 27 Oct 2011 - [60]
- Pressing - grate, 27 Oct 2011 - [61]
- CEB microcontroller repair, 28 Oct 2011 - [62]
- Solenoid driver replacement, 28 Oct 2011 - [63]
- Saturday the 29th pressing, 29 Oct 2011 - [64]
- CEB slurry preparation, 4 Nov 2011 - [65]
- Nov 12 pressing, 12 Nov 2011 - [66]
- Bridging, 12 Nov 2011 - [67]
- Meeting of the CEB presses, 12 Nov 2011 - [68]
- Forking pallets of bricks, 12 Nov 2011 - [69]
- Bricks on pallets, 12 Nov 2011 - [70]
- Powell machine, 12 Nov 2011 - [71]
- Pressing scene, 12 Nov 2011 - [72]
- Moving Powell Machine on the scene, 13 Nov 2011 - [73]
- Press Meeting, 13 Nov 2011 - [74]
- Press on trailer, 13 Nov 2011 - [75]
- Column laying tutorial with Yoonseo, 13 Nov 2011 - [76]
- Moving lumber for roof boxes, 14 Nov 2011 - [77]
- Moving lumber for roofs, 14 Nov 2011 - [78]
- Preparing to build columns, 14 Nov 2011 - [79]
- Reinforcing main compression chamber, 14 Nov 2011 - [80]
- CEB press- fitting cracked, 16 Nov 2011 - [81]
- CEB Construction Review, 16 Nov 2011 - [82]
- 2 CEB presses in action, 24 Nov 2011 - [83]
- Brick city, 24 Nov 2011 - [84]
- Windrows of soil, 24 Nov 2011 - [85]
- Reject lime soil amendment, 24 Nov 2011 - [86]
- From pulverizer to brick, 25 Nov 2011 - [87]
- Pulverizer munching soil, 25 Nov 2011 - [88]
- From pulverizer to brick line, 25 Nov 2011 - [89]
- Reject Lime Blocks, 25 Nov 2011 - [90]
- Column prototype, 25 Nov 2011 - [91]
- 1600 bricks on October 18, 25 Nov 2011 - [92]
- Loading soil without pulverizer, 25 Nov 2011 - [93]
- Loading hopper straight from loader bucket, 26 Nov 2011 - [94]
- Shaker function, 26 Nov 2011 - [95]
- 1 minute of pressing, 26 Nov 2011 - [96]
- 1 minute pressing 2, 26 Nov 2011 - [97]
- Perfect day for pressing bricks, 26 Nov 2011 - [98]
- Another minute of pressing - 6" tall bricks, 26 Nov 2011 - [99]
- Shaker and stacking, 26 Nov 2011 - [100]
- Loading soil without pulverizer, 26 Nov 2011 - [101]
- Shaker detail, 26 Nov 2011 - [102]
- Shaker shaking soil down ceb machine, 26 Nov 2011 - [103]
- Another minute, 26 Nov 2011 - [104]
- Brick city November 28, 28 Nov 2011 - [105]
- One minute of 4" bricks, 28 Nov 2011 - [106]
- Another minute and shaker, 28 Nov 2011 - [107]
- Reinforcing CEB compression chamber, 28 Nov 2011 - [108]
- Brick pressing and roller setup, 28 Nov 2011 - [109]
- Brick mudding and laying, 28 Nov 2011 - [110]
- Replacing solenoid driver board on CEB controller, 29 Nov 2011 - [111]
- James Slade on shaker motor safety plate, 1 Dec 2011 - [112]
- Ceb press brick rollers, 1 Dec 2011 - [113]
- Rollers coming off the production line, 2 Dec 2011 - [114]
- Dec 2 last Day pressing, 2 Dec 2011 - [115]
- Meeting on CEB preparation october, 2 Dec 2011 - [116]
- Taking CEB press apart for documentation, 4 Dec 2011 - [117]
- Laying CEB columns below zero, 7 Dec 2011 - [118]
- Workshop walls subzero, 7 Dec 2011 - [119]
- Tractor and wall build, 7 Dec 2011 - [120]
- Workshop wall detail, 11 Dec 2011 - [121]
- Spraying bricks, 11 Dec 2011 - [122]
- Column laying technique, 11 Dec 2011 - [123]
- CEB walls coming up, 11 Dec 2011 - [124]
- CEB Disassembly documentation, 11 Dec 2011 - [125]
- CEB Operation - Intoduction, 24 Dec 2011 - [126]
- CEB Press - Pressing Animation, 29 Dec 2011 - [127]
Controller
- Controller wiring 1, 7 Oct 2011 - [128]
- Controller wiring 2&3, 7 Oct 2011 - [129]
- Controller wiring 4, 7 Oct 2011 - [130]
- Controller 5, 7 Oct 2011 - [131]
- Controller 6, 7 Oct 2011 - [132]
Surface Mount
- CEB solenoid driver - surface mount 1, 5 Dec 2011 - [133]
- CEB solenoid driver - surface mount - part 2, 5 Dec 2011 - [134]
- Surface mount part 3, 5 Dec 2011 - [135]
- Surface mount part 4, 6 Dec 2011 - [136]
- Surface mount part 5, 6 Dec 2011 - [137]
- Surface mount part 6, 6 Dec 2011 - [138]
- Surface mount part 7, 6 Dec 2011 - [139]
- Surface mount part 8, 6 Dec 2011 - [140]
- Surface mount part 9, 6 Dec 2011 - [141]
- Surface mount part 10, 6 Dec 2011 - [142]
- Surface mount part 11, 6 Dec 2011 - [143]
- Surface mount part 12, 6 Dec 2011 - [144]
- Surface mount part 13, 6 Dec 2011 - [145]
- Surface mount part 14, 6 Dec 2011 - [146]
- Surface mount part 15, 6 Dec 2011 - [147]
- Surface mount part 16, 7 Dec 2011 - [148]
- Surface mount part 17, 7 Dec 2011 - [149]
- Surface mount part 18, 7 Dec 2011 - [150]
- Surface mount part 19, 7 Dec 2011 - [151]
- Surface mount part 20, 7 Dec 2011 - [152]
- Surface mount part 21, 7 Dec 2011 - [153]
Cement Mixer
- Prototype 1 loader mounted cement mixer, 11 Nov 2011 - [154]
- Prototype 1 loader mounted cement mixer 2, 11 Nov 2011 - [155]
- Getting cement mixer going, 24 Nov 2011 - [156]
- Cement truck arrives, 4 Oct 2011 - [157]
- Loader mounted cement mixer, 26 Nov 2011 - [158]
- Cement mixer in action, 26 Nov 2011 - [159]
- Mixer lid closed, 26 Nov 2011 - [160]
- Loading cement mixer, 26 Nov 2011 - [161]
- Attaching mixer to bobcat, 26 Nov 2011 - [162]
- Intro on cement mixer, 26 Nov 2011 - [163]
- Roof cement foundation coating, 7 Dec 2011 - [164]
Sawmill
- Dimensional Sawmill Part 1, 10 Sep 2011 - [165]
- Dimensional Sawmill Part 2, 10 Sep 2011 - [166]
- Dimensional Sawmill Part 3, 10 Sep 2011 - [167]
- Dimensional Sawmill Part 4, 10 Sep 2011 - [168]
- Open Source dimensional sawmill fabrication interview, 12 Sep 2011 - [169]
- Prototyping costs of dimensional sawmill, 22 Sep 2011 - [170]
- Sawmill z, 22 Sep 2011 - [171]
- Sawmill 1, 7 Dec 2011 - [172]
- Sawmill 2, 7 Dec 2011 - [173]
- Sawmill 3, 7 Dec 2011 - [174]
Agriculture
Tractor
- (Factor e Live 9) Open Source Tractor, Rototiller, Biodiesel Reactor, Solar Panels, 21 Sep 2008 - [175]
- LifeTrac Walkthrough (15 Mar 2009), 15 Mar 2009 - [176]
- more LifeTrac detail, 18 Mar 2009 - [177]
- Augering Post and Planting Holes, 28 Apr 2009 - [178]
- Loader Arms Adjustment, 11 Jun 2009 - [179]
- Lifetrac Drive, 16 Apr 2011 - [180]
- LifeTrack III, 16 Apr 2011 - [181]
- Bending of Tracks for Tractor, 27 Aug 2011 - [182]
- Lifetrac Erging from Cave, 7 Sep 2011 - [183]
- LifeTrac Trimmed in Half, 11 Sep 2011 - [184]
- Midnight oil episode: lifetrac shipping, 26 Sep 2011 - [185]
- Documenting Lifetrac with Ian, 26 Sep 2011 - [186]
- How to get Lifetrac up?, 27 Sep 2011 - [187]
- Loading Lifetrac, 27 Sep 2011 - [188]
- Chaining Lifetrac up, 27 Sep 2011 - [189]
- Lifetrac up!, 27 Sep 2011 - [190]
- Lifetrac on trailer, 27 Sep 2011 - [191]
- Ready to ship, 27 Sep 2011 - [192]
- Lifetrac control valves, 27 Sep 2011 - [193]
- LifeTrac Power Cube chokes, 27 Sep 2011 - [194]
- LifeTrac shipping off, 27 Sep 2011 - [195]
- Industry standard bulldozer, 28 Sep 2011 - [196]
- Welding Lifetrac tracks, 3 Oct 2011 - [199]
- Lifetrac Tracks design and jig comments, 3 Oct 2011 - [200]
- Filling Tractor 2 with hydraulic fluid, 4 Oct 2011 - [201]
- Motor control valve plumbing, 7 Oct 2011 - [202]
- First FeF Hydraulic Hack, 7 Oct 2011 - [203]
- Lifetrac 3 tracks, 10 Oct 2011 - [204]
- Welding remaining mufflers, 15 Oct 2011 - [205]
- Welding lifetarac mufflers, 15 Oct 2011 - [206]
- Lifetrac motor coupler failure, 15 Oct 2011 - [207]
- Power cube tabs connecting to tractor, 15 Oct 2011 - [208]
- Lifetrac shaft coupler, 21 Oct 2011 - [209]
- Pressure relief setting, 22 Oct 2011 - [210]
- Case drain returns on tractor, 22 Oct 2011 - [211]
- Power cube power and return, 22 Oct 2011 - [212]
- Prototype 1 loader mounted cement mixer 2, 11 Nov 2011 - [213]
- Prototype 1 loader mounted cement mixer, 11 Nov 2011 - [214]
- Getting cement mixer going, 24 Nov 2011 - [215]
- Lifetrac modification, 28 Nov 2011 - [216]
- Lifetrac - dismounting wheels, 28 Nov 2011 - [217]
- Bobcat exploded, 28 Nov 2011 - [218]
- Bobcat explosion 1, 28 Nov 2011 - [219]
- Bobcat to Lifetrac conversion plate, 1 Dec 2011 - [220]
- Lifetrac moving rebar and bending table into place, 2 Dec 2011 - [221]
- Lifetrac weight balancing, 2 Dec 2011 - [222]
- Filling Lifetrac with gash, 2 Dec 2011 - [223]
- Filling Lifetrac with gas, 2 Dec 2011 - [224]
- Loading Lifetrac up, 2 Dec 2011 - [225]
- Loading rebar, 2 Dec 2011 - [226]
- Rebar load on tractor, 2 Dec 2011 - [227]
- Loading rebar on tractor, 2 Dec 2011 - [228]
- Bent rebar on tractor, 2 Dec 2011 - [229]
- Lifetrac test drive, 2 Dec 2011 - [230]
- Tractor Disassembly video, 4 Dec 2011 - [231]
- Tractor in pieces, 7 Dec 2011 - [232]
- Tractor and wall build, 7 Dec 2011 - [233]
- Heater and tractor, 7 Dec 2011 - [234]
- Cutting hussars for tractor wheels with a bandsaw, 9 Dec 2011 - [235]
- Wellding Lifetrac wheel collars, 10 Dec 2011 - [236]
- Shortening prototype 2 Lifetrac to make prototype 3, 11 Dec 2011 - [237]
- Shortening prototype 2, 11 Dec 2011 - [238]
- Towards Lifetrac 3, 11 Dec 2011 - [239]
- Gap in Lifetrac 2, 11 Dec 2011 - [240]
- Gap in Lifetrac 2 part 2, 11 Dec 2011 - [241]
- Lifetrac 2 simple drive, 11 Dec 2011 - [242]
- Tractor wheel valve hydraulics modification, 13 Dec 2011 - [243]
- New Lifetrac hydraulic motor, 16 Dec 2011 - [244]
- Lifetrac modification - bent loader arms, 19 Dec 2011 - [245]
- Lifetrac loader arms version 2, 22 Dec 2011 - [246]
- New bent loader arms, 2 Jan 2012 - [247]
- Tractor Operation, Safety, Maintenance, Troubleshooting, and Repair Introduction, 24 Dec 2011 - [248]
Lifetrac to Bobcat Conversion
- Lifetrac to Bobcat Conversion Plate, 12 Sep 2011 - [249]
- Bobcat to Lifetrac conversion plate, 20 Oct 2011 - [250]
- Bobcat hydraulics conversion, 21 Oct 2011 - [251]
- Bobcatto Lifetrac hydraulics step 2, 21 Oct 2011 - [252]
- Step 3, 21 Oct 2011 - [253]
- Step 4, 21 Oct 2011 - [254]
- Step 5, 21 Oct 2011 - [255]
- Step 6, 21 Oct 2011 - [256]
- Step 7, 21 Oct 2011 - [257]
- Step 8, 21 Oct 2011 - [258]
- Step 8.5, 21 Oct 2011 - [259]
- Step 9, 21 Oct 2011 - [260]
- Part 10, 21 Oct 2011 - [261]
Quick Attach Wheel
- Quick Attach wheel 1, 21 Dec 2011 - [262]
- Quick Attach wheel 2, 22 Dec 2011 - [263]
- Quick Attach wheel 3, 22 Dec 2011 - [264]
- Quick Attach wheel 4, 22 Dec 2011 - [265]
- Quick Attach wheel 5, 22 Dec 2011 - [266]
- Quick Attach wheel 6, 22 Dec 2011 - [267]
- Quick Attach wheel 6 part 2, 22 Dec 2011 - [268]
- Quick Attach wheel 7, 22 Dec 2011 - [269]
- Quick Attach wheel 8, 22 Dec 2011 - [270]
- Quick Attach wheel 9, 22 Dec 2011 - [271]
- Quick Attach wheel 10, 22 Dec 2011 - [272]
- Quick Attach wheel 11, 22 Dec 2011 - [273]
- Quick Attach wheel 12, 22 Dec 2011 - [274]
- Quick Attach wheel 13, 22 Dec 2011 - [275]
- Quick Attach wheel 14, 22 Dec 2011 - [276]
- Quick Attach wheel 15, 22 Dec 2011 - [277]
- Quick Attach wheel 16, 22 Dec 2011 - not found - maybe it was mislabelled with part 6 twice.
- Quick Attach wheel 17, 2 Jan 2011 - [278]
- Quick Attach wheel 18, 2 Jan 2011 - [279]
- Quick Attach wheel 19, 2 Jan 2011 - [280]
- Quick Attach wheel 20, 2 Jan 2011 - [281]
- Quick Attach wheel 21, 2 Jan 2011 - [282]
- Quick Attach wheel assembly walkthrough, 23 Dec 2011 - [283]
Soil Pulverizer
- (Factor e Live 9) Open Source Tractor, Rototiller, Biodiesel Reactor, Solar Panels, 21 Sep 2008 - [284]
- Soil pulverizer prototype 3, 22 Sep 2011 - [285]
- Pulverizer stop angle mod, 22 Sep 2011 - [286]
- Soil Pulverizer prototype 3 complete, 23 Sep 2011 - [287]
- Soil Pulverizer prototype 3 welding, 23 Sep 2011 - [288]
- Loading soil Pulverizer - mower, 3 Oct 2011 - [289]
- Soil Pulverizer prototype 3, 8 Oct 2011 - [290]
- Bobcat meets pulverizer, 20 Oct 2011 - [291]
- Soil Pulverizer on bobcat, 20 Oct 2011 - [292]
- Pulverizer mounts on bobcat, 20 Oct 201 - [293]
- Soil pulverizer field testing report, 24 Nov 2011 - [294]
- From pulverizer to brick, 25 Nov 2011 - [295]
- Pulverizer munching soil, 25 Nov 2011 - [296]
- From pulverizer to brick line, 25 Nov 2011 - [297]
- Reject Lime Blocks, 25 Nov 2011 - [298]
- Loading soil without pulverizer, 25 Nov 2011 - [299]
- Loading soil without pulverizer, 25 Nov 2011 - [300]
- Loading hopper straight from loader bucket, 26 Nov 2011 - [301]
- Soil pulverizer overview, 29 Nov 2011 - [302]
- Moving soil pulverizer into shop, 29 Nov 2011 - [303]
- Bobcat conversion plate mounts pulverizer, 1 Dec 2011 - [304]
- Pulverizer Disassembly, 12 Dec 2011 - [305]
- Soil Pulverizer Operation, Safety, Maintenance, Troubleshooting, and Repair Introduction, 24 Dec 2011 - [306]
Backhoe
Baler
- Preparation for baling, 2 Oct 2011 - [309]
- Docenting the baling documentor, 2 Oct 2011 - [310]
- Mower ate a round bale, 2 Oct 2011 - [311]
- Stumped, 2 Oct 2011 - [312]
- Random Shot of Old Hay Baler, 11 Sep 2011 - [313]
- Hay conditioner 101, 2 Oct 2011 - [314]
- Meet the hay conditioner, 2 Oct 2011 - [315]
- HabLab and mowing for bales, 3 Oct 2011 - [316]
- Baling ergonomics, 5 Oct 2011 - [317]
- Countdown to baling, 5 Oct 2011 - [318]
- Baling day 1, 5 Oct 2011 - [319]
- Getting ready to bale, 5 Oct 2011 - [320]
- Baler adjustment, 5 Oct 2011 - [321]
- Engaging the baler, 5 Oct 2011 - [322]
- PTO engaged, 5 Oct 2011 - [323]
- Straw quality, 5 Oct 2011 - [324]
- First bale, 5 Oct 2011 - [325]
- Baling shakedown in progress, 5 Oct 2011 - [326]
- Baling 1, 5 Oct 2011 - [327]
- Baling 2, 5 Oct 2011 - [328]
- Baling 3, 5 Oct 2011 - [329]
- Baling 4, 5 Oct 2011 - [330]
- Baling 5, 5 Oct 2011 - [331]
- Baling 6, 5 Oct 2011 - [332]
- Baling 7, 5 Oct 2011 - [333]
- Baling 8, 6 Oct 2011 - [334]
- Baling 9, 6 Oct 2011 - [335]
- Baling day 1 summary, 6 Oct 2011 - [336]
- Baling results - day 2, 6 Oct 2011 - [337]
- On trailer to pick up bales, 7 Oct 2011 - [338]
- Picking up bales, 7 Oct 2011 - [339]
- Documentor on bales, 7 Oct 2011 - [340]
- 90 bales in 20' trailer, 7 Oct 2011 - [341]
- Stacking strawbales, 7 Oct 2011 - [342]
- Temporary bale structure, 7 Oct 2011 - [343]
- Temporary bale structure floor, 7 Oct 2011 - [344]
- Floor coming together, 7 Oct 2011 - [345]
- 8 minutes to build a platform, 7 Oct 2011 - [346]
- Beginning to stack bales on platform, 7 Oct 2011 - [347]
- Temporary bale structure, 7 Oct 2011 - [348]
- Picking up bales, 7 Oct 2011 - [349]
- Picking up bales 2, 7 Oct 2011 - [350]
- Dropping off bales, 7 Oct 2011 - [351]
Industry
Torch Table
- Torch Table finishing 1 - 16 Apr 2011 - [352]
- Torch table with faulty Xylotex controller, 17 May 2011 - [353]
- CNC Torch Table Tip height, 11 Sep 2011 - [354]
- Cnc torch table height adjustment, 10 Dec 2011 - [355]
Lathe
3D Printer
- HydraRaptor, 6 Apr 2009 - [358]
- HydraRaptor (part 2), 7 Apr 2009 - [359]
- Detroit fab lab solenoid driver, 22 Sep 2011 - [360]
Energy
Power Cube
- Torching Engine Mount Plates for Power Cube, Part 1, 1 Sep 2011 - [361]
- Torching Engine Mount Plates for Power Cube, Part 1, 1 Sep 2011 - [362]
- Power Cube Frames, 7 Sep 2011 - [363]
- Power Cube Welding with 90 Amp MIG Welder, 10 Sep 2011 - [364]
- Power Cube Fabrication Step 1, 11 Sep 2011 - [365]
- Power Cube Fabrication Step 2, 11 Sep 2011 - [366]
- Power Cube Fabrication Step 3, 11 Sep 2011 - [367]
- Power Cube Fabrication Step 4, 11 Sep 2011 - [368]
- Power Cube Fabrication Step 5 - Clamping, 11 Sep 2011 - [369]
- Briggs and Stratton Interim Power Cube 27 hp Engine Leak, 10 Sep 2011 - [370]
- Leak part 1, 11 Sep 2011 - [371]
- Leak part 2, 11 Sep 2011 - [372]
- Leak part 3, 11 Sep 2011 - [373]
- Battery container welding, 12 Sep 2011 - [374]
- Hydraulic Cooler Mounting, 12 Sep 2011 - [375]
- The Memorial Tom Griffing Power Cube, 12 Sep 2011 - [376]
- Power Cube Extending Plates, 12 Sep 2011 - [377]
- Tacking battery mounts, 12 Sep 2011 - [378]
- Key and throttle mounts, 12 Sep 2011 - [379]
- Battery Mount Cutting, 12 Sep 2011 - [380]
- Torching motor mount plate shaft hole, 12 Sep 2011 - [381]
- Assembly order review for power cube, 12 Sep 2011 - [382]
- Power Cube Power Switch, 13 Sep 2011 - [383]
- Hydraulic Cooler mount bolt locations, 13 Sep 2011 - [384]
- Kohler Engine mounting in PC, 14 Sep 2011 - [385]
- Hydraulic cooler mount overview, 14 Sep 2011 - [386]
- Kohler 25 hp mounting hint, 14 Sep 2011 - [387]
- Hydraulic cooler mounting and bolts, 14 Sep 2011 - [388]
- Kohler engine mounting nightmares, 14 Sep 2011 - [389]
- Tightening Kohler engine bolts, 14 Sep 2011 - [390]
- Notice on hydraulic pump mounting, 14 Sep 2011 - [391]
- Fan mounting, 14 Sep 2011 - [392]
- Pump mounting bolts size, 14 Sep 2011 - [393]
- Fan trim for power cube, 14 Sep 2011 - [394]
- Power Cube component measurements, 14 Sep 2011 - [395]
- Engine to pump coupling overview, 14 Sep 2011 - [396]
- Mounts and bolts for fans, 14 Sep 2011 - [397]
- Pump mount plate detail, 14 Sep 2011 - [398]
- Last dilemma of 25 hp Kohler mounting, 14 Sep 2011 - [399]
- Tacking hydraulic cooler in place, 14 Sep 2011 - [400]
- Tacking hydraulic cooler in place part 2, 14 Sep 2011 - [401]
- Pump Mounting refinement, 15 Sep 2011 - [402]
- Preferred engine mounting, 15 Sep 2011 - [403]
- Engine insertion into frame, 15 Sep 2011 - [404]
- Engine mounting lifetime design strategy, 15 Sep 2011 - [405]
- Pump bolt detail, 15 Sep 2011 - [406]
- Pump mounting with 4.5"x3/4" bolts, 16 Sep 2011 - [407]
- Loose pump, 16 Sep 2011 - [408]
- Welding pump plates to engine plates, 16 Sep 2011 - [409]
- Power Cube production line, 16 Sep 2011 - [410]
- Fan Attachment, 17 Sep 2011 - [411]
- Fan mount bolt pattern - welding, 17 Sep 2011 - [412]
- Fan bolt specs, 17 Sep 2011 - [413]
- Protecting bolt threads, 17 Sep 2011 - [414]
- Starter switch wiring on power cube, 20 Sep 2011 - [415]
- Irregular fan mounts, 22 Sep 2011 - [416]
- Dangling Power, 23 Sep 2011 - [417]
- Kohler starter solenoid nut, 24 Sep 2011 - [418]
- Filling power cube with hydraulic fluid, 24 Sep 2011 - [419]
- LifeTrac Power Cube chokes, 27 Sep 2011 - [420]
- Filling Tractor 2 with hydraulic fluid, 4 Oct 2011 - [421]
- Filling power cube, 4 Oct 2011 - [422]
- Muffler design, 5 Oct 2011 - [423]
- Tack Welding cooler mounts, 7 Oct 2011 - [424]
- Pump mounting variations, 7 Oct 2011 - [425]
- Torching mount plates for motor on power cube, 7 Oct 2011 - [426]
- Battery mount cutting, 7 Oct 2011 - [427]
- Tacking battery mounts, 7 Oct 2011 - [428]
- Power Cube wiring 2, 15 Oct 2011 - [429]
- Power cube tabs connecting to tractor, 15 Oct 2011 - [430]
- Case drain returns on tractor, 22 Oct 2011 - [431]
- Power cube power and return, 22 Oct 2011 - [432]
- Welding battery tabs, 2 Dec 2011 - [433]
- Kohler mount - 2" longer, 3 Dec 2011 - [434]
- Fitting issues on Kohler engine, 3 Dec 2011 - [435]
- Power Cube Operation, Safety, Maintenance, Troubleshooting, and Repair Introductions, 24 Dec 2011 - [436]
Solar Concentrator
- Solar Panel Construction 1, 21 Jul 2008 - [437]
- Solar Panel Construction 2, 21 Jul 2008 - [438]
- Solar Panel Construction 3, 21 Jul 2008 - [439]
- Factor e Live 8, Advanced CEB Press and Solar Panels, 3 Sep 2008 - [440]
- (Factor e Live 9) Open Source Tractor, Rototiller, Biodiesel Reactor, Solar Panels, 21 Sep 2008 - [441]
Heat Exchanger
- Heat Exchanger, 2 Nov 2007 - [442]
Building/Construction
Workshop/HabLab
- Workshop excavation, 27 Sep 2011 - [443]
- Column excavation ergonomic analysis, 27 Sep 2011 - [444]
- Excavation workflow and ergonomics, 27 Sep 2011 - [445]
- Roof stringer structural testing plan, 27 Sep 2011 - [446]
- Pre-construction scene, 28 Sep 2011 - [447]
- Preconstruction with dozer, 28 Sep 2011 - [448]
- Preconstruction with dozer 2, 28 Sep 2011 - [449]
- Excavator beginning, 28 Sep 2011 - [450]
- Gravel spreading, 28 Sep 2011 - [451]
- HabLab 1 - bulldozing, 28 Sep 2011 - [452]
- HabLab 2, 28 Sep 2011 - [453]
- HabLab 3, 28 Sep 2011 - [454]
- HabLab 4, 28 Sep 2011 - [455]
- HabLab 5, 28 Sep 2011 - [456]
- Gravel base with skid loader, 28 Sep 2011 - [457]
- Gravel trucks, 28 Sep 2011 - [458]
- HabLab documentor, 28 Sep 2011 - [459]
- Riding the Cat D7 dozer, 28 Sep 2011 - [460]
- Cat D7 bulldozer fuel consumption, 28 Sep 2011 - [461]
- HabLab excavation, 28 Sep 2011 - [462]
- HabLab bulldozing view from Hexayurt, 28 Sep 2011 - [463]
- HabLab excavator and dozer, 28 Sep 2011 - [464]
- HabLab corner excavation, 28 Sep 2011 - [465]
- Foundation pads- night before concrete pour, 30 Sep 2011 - [466]
- Column foundation forms, 30 Sep 2011 - [467]
- Excavation discussions, 1 Oct 2011 - [468]
- Nearly finished grading, 1 Oct 2011 - [469]
- Clearing off vegetation, 1 Oct 2011 - [470]
- Dozer parking, 2 Oct 2011 - [471]
- Starting the dozing, 2 Oct 2011 - [472]
- Beginning to clear vegetation, 2 Oct 2011 - [473]
- More clearing vegetation, 2 Oct 2011 - [474]
- Excavator documentor, 2 Oct 2011 - [475]
- HabLab and mowing for bales, 3 Oct 2011 - [476]
- Concrete pads 101, 4 Oct 2011 - [477]
- Cement truck arrives, 4 Oct 2011 - [478]
- Ergonomic analysis of excavation, 5 Oct 2011 - [479]
- Screeing foundation pads, 5 Oct 2011 - [480]
- Living units- wall foundation pour, 13 Oct 2011 - [481]
- Rebar for HabLab, 13 Oct 2011 - [482]
- Preparing for wall foundations, 13 Oct 2011 - [483]
- HabLab rebar and embodied energy, 14 Oct 2011 - [484]
- HabLab foundations panorama, 14 Oct 2011 - [485]
- Ready to pour HabLab foundations, 14 Oct 2011 - [486]
- Pour panorama, 14 Oct 2011 - [487]
- Little dry, 14 Oct 2011 - [488]
- 8 cubic yards, 14 Oct 2011 - [489]
- Beginning to pour, 14 Oct 2011 - [490]
- Pour sock, 14 Oct 2011 - [491]
- Floating, 14 Oct 2011 - [492]
- Moving rebar to HabLab site, 14 Oct 2011 - [493]
- Pouring panorama, 15 Oct 2011 - [494]
- Workshop Slab, 4 Nov 2011 - [495]
- Concrete slab joints cutting, 5 Nov 2011 - [496]
- Release cut ergonomics, 5 Nov 2011 - [497]
- Workshop columns growing, 5 Nov 2011 - [498]
- Saturday the 29th pressing, 29 Oct 2011 - [499]
- CEB slurry preparation, 4 Nov 2011 - [500]
- Nov 12 pressing, 12 Nov 2011 - [501]
- Bridging, 12 Nov 2011 - [502]
- Meeting of the CEB presses, 12 Nov 2011 - [503]
- Forking pallets of bricks, 12 Nov 2011 - [504]
- Bricks on pallets, 12 Nov 2011 - [505]
- Powell machine, 12 Nov 2011 - [506]
- Pressing scene, 12 Nov 2011 - [507]
- Moving Powell Machine on the scene, 13 Nov 2011 - [508]
- Press Meeting, 13 Nov 2011 - [509]
- Press on trailer, 13 Nov 2011 - [510]
- Column laying tutorial with Yoonseo, 13 Nov 2011 - [511]
- Moving lumber for roof boxes, 14 Nov 2011 - [512]
- Moving lumber for roofs, 14 Nov 2011 - [513]
- Preparing to build columns, 14 Nov 2011 - [514]
- Covering the Workshop, 22 Nov 2011 - [515]
- Floyd on structure stability, 22 Nov 2011 - [516]
- Next steps on roof with John the carpenter, 22 Nov 2011 - [517]
- Monday morning workshop construction, 22 Nov 2011 - [518]
- Anchoring The roof in, 23 Nov 2011 - [519]
- Workshop roof preparation, 24 Nov 2011 - [520]
- Temporary posts, 24 Nov 2011 - [521]
- Brick city, 24 Nov 2011 - [522]
- Leveling workshop frame, 24 Nov 2011 - [523]
- Workshop skeleton, 24 Nov 2011 - [524]
- Strawbales and shop, 24 Nov 2011 - [525]
- Workshop alignment, 25 Nov 2011 - [526]
- Putting roof sections on workshop, 25 Nov 2011 - [527]
- Roof sections lean on roof, 25 Nov 2011 - [528]
- Roof on mid of next week, 25 Nov 2011 - [529]
- Monday 21st November construction scene, 25 Nov 2011 - [530]
- Column prototype, 25 Nov 2011 - [531]
- 1600 bricks on October 18, 25 Nov 2011 - [532]
- First use of workshop, 27 Nov 2011 - [533]
- Workshop+James Slade, 28 Nov 2011 - [534]
- Moving roof boxes on, 28 Nov 2011 - [535]
- Moving roof boxes, 28 Nov 2011 - [536]
- Brick city November 28, 28 Nov 2011 - [537]
- Pushing roof sections onto workshop, 28 Nov 2011 - [538]
- Monday morning workshop construction, 28 Nov 2011 - [539]
- Unloading plywood and framing, 28 Nov 2011 - [540]
- Roof metal beginning to go on, 1 Dec 2011 - [541]
- Roof going up, 1 Dec 2011 - [542]
- Thursday Dec 1, 1 Dec 2011 - [543]
- On the roof, 2 Dec 2011 - [544]
- Roof going on, 2 Dec 2011 - [545]
- Sliding roof panels up, 2 Dec 2011 - [546]
- HabLab prep, 2 Dec 2011 - [547]
- Moving materials to HabLab site, 2 Dec 2011 - [548]
- Cutting roof metal, 2 Dec 2011 - [549]
- Sliding roof metal up, 2 Dec 2011 - [550]
- Stepping stone for workshop, 7 Dec 2011 - [551]
- Roof cement foundation coating, 7 Dec 2011 - [552]
- Workshop columns beginning for real, 7 Dec 2011 - [553]
- Laying CEB columns below zero, 7 Dec 2011 - [554]
- Workshop walls subzero, 7 Dec 2011 - [555]
- Window frames, 7 Dec 2011 - [556]
- Tractor and wall build, 7 Dec 2011 - [557]
- Walls and torch tables, 7 Dec 2011 - [558]
- Bottom layer blocks, 8 Dec 2011 - [559]
- Bottom CEB layer and electrical integration into wall, 8 Dec 2011 - [560]
- HabLab dry-in beginning, 9 Dec 2011 - [561]
- Grinder with diamond blade, 10 Dec 2011 - [562]
- HabLab steps towards roof, 10 Dec 2011 - [563]
- Workshop wall detail, 11 Dec 2011 - [564]
- Spraying bricks, 11 Dec 2011 - [565]
- Column laying technique, 11 Dec 2011 - [566]
- CEB walls coming up, 11 Dec 2011 - [567]
- Transit 101, 12 Dec 2011 - [568]
- HabLab materializing, 15 Dec 2011 - [569]
- Rafters going on, 15 Dec 2011 - [570]
- HabLab roof support, 15 Dec 2011 - [571]
- HabLab Dec 23, 23 Dec 2011 - [572]
- HabLab Dec 23 2, 23 Dec 2011 - [573]
- Construction in Progress - Results of 2011, 24 Dec 2011 - [574]
- HabLab roof coming on, 2 Jan 2012 - [575]
Digging
- Rotary Hydraulic Well Digging, 3 Apr 2008 - [576]
- Digging a Well Part 2, 6 Aug 2008 - [577]
- Augering Post and Planting Holes, 28 Apr 2009 - [578]
Misc.
- Cordwood Addition Roof, 9 Dec 2007 - [579]
- Goat Birth, 1 May 2008 - [580]
- Walnut Grafting, 4 May 2008 - [581]
- Babington Burner "Flamethrower" Atomizing Oil, 1 Oct 2008 - [582]
- Babington Burner "Flamethrower" Continued, 2 Oct 2008 - [583]
- Open Source On-Demand Water Heater, 2 Nov 2008 - [584]
- Torch Table Day 1, 10 Dec 2008 - [585]
- Ama Makes the Goat Feeder, 20 Feb 2009 - [586]
- Starting the workshop stove for the first time, 1 Mar 2009 - [587]
- Fruit Propagation Workshop, 1 Mar 2009 - [588]
- Future Kitchen, 2 Mar 2009 - [589]
- Making Notebooks, 6 Mar 2009 - [590]
- Grafting and Root Cuttings Details, 7 Mar 2009 - [591]
- Spring Rains, 16 Mar 2009 - [592]
- Hexahatch Incubator, 4 Apr 2009 - [593]
- Industry Standard Cooking Video, 11 Apr 2009 - [594]
- Goat Birth, 16 Apr 2009 - [595]
- Compressed Air Water Pump Design, 10 Jun 2009 - [596]
- Cutting Rocks, 16 Mar 2011 - [597]
- Workshop Addition Complete, 28 Mar 2011 - [598]
- Video of a Wind Turbine, 31 Mar 2011 [599]
- Polish TV Interview, 5 Apr 2011 - [600]
- Random Polish TV Interview Member Clip, 5 Apr 2011 - [601]
- Random Pig Video, 5 Apr 2011 - [602]
- Random Train Ride Clip, 5 Apr 2011 - [603]
- Random HD Sample, 11 Apr 2011 - [604]
- New Welder: Megamig 450, 16 Apr 2011 - [605]
- Welder Testing, 16 Apr 2011 - [606]
- Xylotex Controller Configuration, 16 Apr 2011 - [607]
- Remote Sensing, 17 May 2011 - [608]
- Wheel shaft gussets, 19 Jun 2011 - [609]
- Bandsaw, 19 Jun 2011 - [610]
- Project Update, 4 Aug 2011 - [611]
- Power to Solenoid, 12 Aug 2011 - [612]
- Ergonomics of Cleaning Tank Bungs Prior to Welding, 1 Sep 2011 - [613]
- Fabrication of 5 Fuel and Hydraulic Tanks, 2 Sep 2011 - [614]
- Tapping threaded holes on Engine, 2 Sep 2011 - [615]
- Meeting On Friday, 2 Sep 2011 - [616]
- Grate Shaker Assembly, 3 Sep 2011 - [617]
- Suction Strainer, 6 Sep 2011 - [618]
- True Fans Sunday Update 2, 11 Sep 2011 - [619]
- Shonda, CNC Multimachine, and the Housing Crisis, 12 Sep 2011 - [620]
- HabLab - Margaret Ida, 12 Sep 2011 - [621]
- Natural resources to product, 12 Sep 2011 - [622]
- Last prep for construction Update, 12 Sep 2011 - [623]
- Last prep for construction - loading up, 12 Sep, 2011 - [624]
- Stringers/Wood Beams for OSE Workshop 2011, 13 Sep 2011 - [625]
- KHS Class of 1991 Reunion, 14 Sep 2011 - [626]
- Roof sections for ose shop, 15 Sep 2011 - [627]
- Emergency Construction Funding - Major Success Update, 15 Sep 2011 - [628]
- Global supply chains, 15 Sep 2011 - [629]
- Chickens going freerange, 17 Sep 2011 - [630]
- Staking worksop space for earthworks, 20 Sep 2011 - [631]
- Urban Farming Guys, James Slade replications, 22 Sep 2011 - [632]
- Column foundation rebar, 22 Sep 2011 - [633]
- New Update: Toothbar bucket, tractor tracks, and dimensional sawmill bl, 23 Sep 2011 - [634]
- Random Update: Monday midnight oil update, 28 Sep 2011 - [635]
- 12 foot peach tree, 2 Oct 2011 - [636]
- Pecan apricot catalpa, 2 Oct 2011 - [637]
- Secondary cylinder, 2 Oct 2011 - [638]
- Message to Jason Fields, 3 Oct 2011 - [639]
- Pawpaw Tree, 5 Oct 2011 - [640]
- Shonda - CNC Multimachine beginnings, 8 Oct 2011 - [641]
- Construction planning 1, 12 Oct 2011 - [642]
- Construction planning 2, 10 Oct 2011 - [643]
- GVCS Kickstarter intro video, 13 Oct 2011 - [644]
- Oct 15 update, 15 Oct 2011 - [645]
- Shuttleworth Fellowship Brief, 17 Oct 2011 - [646]
- Oct 18 Update, 18 Oct 2011 - [647]
- Recovery plan on ceb construction, 20 Oct 2011 - [648]
- Stabilized lime blocks, 1 Dec 2011 - [649]
- Oct 20 2011 update, 2 Dec 2011 - [650]
- Ian and Yoonseo, 2 Dec 2011 - [651]
- Dirt and twigs to advanced civilization, 3 Dec 2011 - [652]
- Open source CAD/CAM Solution, 10 Dec 2011 - [653]
- Practical Post Scarcity: Open Source Solutions, 15 Dec 2011 - [654]
True Fans Update
- Dear True Fans: Production Scaling, 18 Sep 2011 - [655]
- Dear True Fans September 25, 2011, 25 Sep 2011 - [656]
- Full Steam Ahead - $60k construction grant is in, 28 Sep 2011 - [657]
- Monday Update, 3 Oct 2011 - [658]
Team Member Interviews
- Isaiah Saxon, 11 Mar 2011 - [659]
- Dan Granett, 11 Mar 2011 - [660]
- Brianna Kufa, 24 Aug 2011 - [661]
- Chris, 24 Aug 2011 - [662]
- Tom, 24 Aug 2011 - [663]
- Ian Conehead, 7 Oct 2011 - [664]
- Ted Mosher dedicated project visit, 7 Oct 2011 - [665]
- Yoonseo, 5 Nov 2011 - [666]
Enterprise
- OSE Certification, 3 Oct 2011 - [667]
- Distributive Enterprise, 16 Dec 2011 - [668]
- Open Source Ecology Enterprise Plan for 2012, 29 Dec 2011 - [669]
TED Talks Event: Behind the Scenes
- Suzanne Lee's Kombucha Clothing, 27 Feb 2011 - [670]
- Meet a TED Fellow, 27 Feb 2011 - [671]
- Fellows Reception, 27 Feb 2011 - [672]
- Putting on makeup part 1, 28 Feb 2011 - [673]
- Putting on makeup part 2, 28 Feb 2011 - [674]
- Putting on makeup part 3, 28 Feb 2011 - [675]
- Random Ted Talks Clip Part 1, 28 Feb 2011 - [676]
- Random Ted Talks Clip Part 2, 28 Feb 2011 - [677]
- Random Ted Talks Clip Part 3, 2 Mar 2011 - [678]
- Random Ted Talks Clip Part 4, 4 Mar 2011 - [679]
- A Ted Talks Presentation - who?, 4 Mar 2011 - [680]
- Interview Lesa Mitchell, Kauffman Foundation, 2 Mar 2011 - [681]
- Interview with Rufus? Who? 4 Mar 2011 - [682]
- After TED Talks Update, 6 Mar 2011 - [683]
- TED Talk - Global Village Construction Set, 6 Oct 2011 - [684]
Factor e Live
- Factor e Live, 2 Jun 2008 - [685]
- Factor e Live Week 2, 18 Jun 2008 - [686]
- Factor e Live - Part 3, 1 Jul 2008 - [687]
- Couldn't find part 4.
- Factor e Live - Part 5, 17 Aug 2008 - [688]
- Factor e Live - Part 6, Solar Turbine Beginnings, 18 Aug 2008 - [689]
- Factor e Live - Episode 7, 25 Aug 2008 - [690]
- (Factor e Live 8) Advanced CEB Press and Solar Panels, 3 Sep 2008 - [691]
- (Factor e Live 9) Open Source Tractor, Rototiller, Biodiesel Reactor, Solar Panels, 21 Sep 2008 - [692]
- (Factor e Live 10) CEB Field Testing, 16 Oct 2008 - [693]
Distillations
- Factor e Live Distillations (part 1), 5 Jan 2009 - [694]
- Factor e Live Distillations (part 2), 7 Jan 2009 - [695]
- Factor e Live Distillations (part 3) Towards the Open Source Tractor, 12 Jan 2009 - [696]
- Factor e Live Distillations (part 4) On the technology base for Evolving to Freedom, 13 Jan 2009 - [697]
- Factor e Live Distillations (part 5) The CEB Story - To Build a Village, 16 Jan 2009 - [698]
- Factor e Live Distillations (part 6) Personal Fabrication Machines, 20 Jan 2009 - [699]
- Factor e Live Distillations (part 7) Open Source Permaculture and Local Food Systems (part 7), 25 Jan 2009 - [700]
- Factor e Live Distillations (part 8) $1/Watt Solar Thermal Concentrator Steam Powered Electric Generator, 3 Feb 2009 - [701]
- Factor e Live Distillations (part 9) Open Collaborative Development, 5 Feb 2009 - [702]
- Factor e Live Distillations (part 10) Open Economic Model, 6 Feb 2009 - [703]
- Factor e Live Distillations - Post Scarcity Village, 10 Sep 2009 - [704]
Professional Opinions
- CEB Construction Review, 16 Nov 2011 - [705]
- Covering the Workshop, 22 Nov 2011 - [706]
- Floyd on structure stability, 22 Nov 2011 - [707]
- Next steps on roof with John the carpenter, 22 Nov 2011 - [708]
- Anchoring The roof in, 23 Nov 2011 - [709]
- Workshop alignment, 25 Nov 2011 - [710]
- Roof on mid of next week, 25 Nov 2011 - [711]
- Reject Lime Blocks, 25 Nov 2011 - [712]
- Column prototype, 25 Nov 2011 - [713]
- Perfect day for pressing bricks, 26 Nov 2011 - [714]
- Fredrick Emmons, 28 Nov 2011 - [715]
- Stabilized lime blocks, 1 Dec 2011 - [716]
- Steam Auto Club of America visits Factor e Farm, 8 Dec 2011 - [717]
- Steam Generator, 8 Dec 2011 - [718]
- Wally Munster modern steam engine, 8 Dec 2011 - [719]
- Burning smoke for a clean flame, 8 Dec 2011 - [720]
- HabLab steps towards roof, 10 Dec 2011 - [721]
- Workshop wall detail, 11 Dec 2011 - [722]
- Spraying bricks, 11 Dec 2011 - [723]
- Column laying technique, 11 Dec 2011 - [724]
- HabLab roof support, 15 Dec 2011 - [725]
Documentation Strategy
- Documentation evolving, 7 Oct 2011 - [726]
- Remote technical documentation strategy, 22 Oct 2011 - [727]
Product Introductions
- CEB Operation - Intoduction, 24 Dec 2011 - [728]
- Tractor Operation, Safety, Maintenance, Troubleshooting, and Repair Introduction, 24 Dec 2011 - [729]
- Soil Pulverizer Operation, Safety, Maintenance, Troubleshooting, and Repair Introduction, 24 Dec 2011 - [730]
- Power Cube Operation, Safety, Maintenance, Troubleshooting, and Repair Introductions, 24 Dec 2011 - [731]