Related changes

Jump to navigation Jump to search

Enter a page name to see changes on pages linked to or from that page. (To see members of a category, enter Category:Name of category). Changes to pages on your Watchlist are in bold.

Recent changes options Show last 50 | 100 | 250 | 500 changes in last 1 | 3 | 7 | 14 | 30 days
Hide registered users | Hide anonymous users | Hide my edits | Show bots | Hide minor edits
Show new changes starting from 20:44, 15 January 2026
   
Page name:
List of abbreviations:
N
This edit created a new page (also see list of new pages)
m
This is a minor edit
b
This edit was performed by a bot
(±123)
The page size changed by this number of bytes

15 January 2026

N    14:25  Seed Eco-Home Optimized Build Time‎‎ 14 changes history +5,494 [Marcin‎ (14×)]
     
14:25 (cur | prev) 0 Marcin talk contribs (→‎The Expertise-Embedded Design Principle (EEDP))
     
14:25 (cur | prev) +74 Marcin talk contribs (→‎The Expertise-Embedded Design Principle (EEDP))
     
14:22 (cur | prev) +137 Marcin talk contribs (→‎The Expertise-Embedded Design Principle (EEDP))
     
14:20 (cur | prev) −131 Marcin talk contribs (→‎The Expertise-Embedded Design Principle (EEDP))
     
14:20 (cur | prev) +466 Marcin talk contribs (→‎The Expertise-Embedded Design Principle (EEDP))
     
14:19 (cur | prev) +24 Marcin talk contribs (→‎Expertise-Embedded Design Principle (EEDP))
     
14:17 (cur | prev) +2,070 Marcin talk contribs (→‎The Expertise-Embedded Design Principle (EEDP))
     
14:16 (cur | prev) +11 Marcin talk contribs (→‎The Expertise-Embedded Design Principle (EEDP))
     
14:15 (cur | prev) +405 Marcin talk contribs (→‎Significance)
     
14:13 (cur | prev) +1 Marcin talk contribs (→‎Assumptions)
     
13:59 (cur | prev) +15 Marcin talk contribs (→‎Build-Day Scorecard)
     
13:54 (cur | prev) +75 Marcin talk contribs
     
13:50 (cur | prev) +324 Marcin talk contribs (→‎May 1 Labor Target – Phase Breakdown (1,000 ft² Seed Eco-Home))
N    
13:48 (cur | prev) +2,023 Marcin talk contribs (Created page with "= May 1 Labor Target – Phase Breakdown (1,000 ft² Seed Eco-Home) = ''Assumptions:'' * Repeatable design, low roof complexity * Tight logistics (kitted, staged materials) * Minimal rework * Utilities not extreme * KPI = On-site person-hours (track prefab separately if applicable) == A) Site Prep & Foundation == * Scope: layout, excavation, foundation system, backfill/rough grade * Target: '''70–110 hours''' == B) Structural Shell == * Scope: floor (if any), walls,...")