Related changes

Jump to navigation Jump to search

Enter a page name to see changes on pages linked to or from that page. (To see members of a category, enter Category:Name of category). Changes to pages on your Watchlist are in bold.

Recent changes options Show last 50 | 100 | 250 | 500 changes in last 1 | 3 | 7 | 14 | 30 days
Hide registered users | Hide anonymous users | Hide my edits | Show bots | Hide minor edits
Show new changes starting from 05:50, 28 January 2026
   
Page name:
List of abbreviations:
N
This edit created a new page (also see list of new pages)
m
This is a minor edit
b
This edit was performed by a bot
(±123)
The page size changed by this number of bytes

27 January 2026

N    08:23  Integrated Agriculture Business Model‎‎ 4 changes history +778 [Marcin‎ (4×)]
     
08:23 (cur | prev) +51 Marcin talk contribs
     
02:46 (cur | prev) +187 Marcin talk contribs
     
02:44 (cur | prev) +357 Marcin talk contribs
N    
02:37 (cur | prev) +183 Marcin talk contribs (Created page with "Designing an integrated model with many diverse parts. {{subst:embed}}")
     05:16 Move log Marcin talk contribs moved page Zero Marginal Cost Electricity Production to Zero Marginal Energy Cost
N    05:11  Zero Marginal Cost Electricity Production‎‎ 3 changes history +1,926 [Marcin‎ (3×)]
     
05:11 (cur | prev) +91 Marcin talk contribs
     
05:10 (cur | prev) +330 Marcin talk contribs
N    
05:02 (cur | prev) +1,505 Marcin talk contribs (Created page with "Deive the cost per kilowatt hour for PV panels that cost $200 per kilowatt - is that the current bulk cost? Assume the standard lifetime, and inverters that cost $100 per kilowatt - is that the correct cost? Assume no storage, and mounting cost of $10/kw because it is building-integrated. Chat says: https://chatgpt.com/share/6978447d-0958-8010-a31f-e4e788cab0bf Wiring is DC bus at 500V carrying 200A or 100kW, linear array say of 200 feet long, 10 panels deep, each pane...")

26 January 2026

     23:45  Incremental Housing Construction Set diffhist +204 Marcin talk contribs
N    04:35  Extreme Enterprise Track diffhist +98 Marcin talk contribs (Redirected page to Future Builders Academy Curriculum#4. Extreme Enterprise Program - The Remote Option) Tag: New redirect
     04:30  Summer X 2026‎‎ 10 changes history +2,281 [Marcin‎ (10×)]
     
04:30 (cur | prev) +16 Marcin talk contribs
     
04:18 (cur | prev) +8 Marcin talk contribs
     
03:53 (cur | prev) +550 Marcin talk contribs
     
03:46 (cur | prev) +367 Marcin talk contribs
     
03:44 (cur | prev) +97 Marcin talk contribs
     
03:39 (cur | prev) +15 Marcin talk contribs
     
03:22 (cur | prev) +248 Marcin talk contribs
     
03:18 (cur | prev) −1 Marcin talk contribs
     
02:58 (cur | prev) +438 Marcin talk contribs
     
02:50 (cur | prev) +543 Marcin talk contribs
     02:54  Civilization 100 diffhist +159 Marcin talk contribs

25 January 2026

     03:00  Civilization 100 diffhist +104 Marcin talk contribs

24 January 2026

N    14:04  Summer X 2026‎‎ 2 changes history +28 [Marcin‎ (2×)]
     
14:04 (cur | prev) +4 Marcin talk contribs (→‎Links)
N    
14:04 (cur | prev) +24 Marcin talk contribs (Created page with " =Links= *Summer X 2021.")