2014-07-16 (Wednesday):
{{RightTOC}}
-----------------------
'''Please post most recent entry on top'''
  - 19:00: Arrival to MCI airport.
[[Category:Logs]]
  - 21:00: Arrival to Factor eFarm.
  - 23:00: Sleep


2014-07-17 Thursday:
=2014-09-04 - Departure=
------------
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.
  - 10:00: Teamwork to redesign the OSE documentation system.
  - 13:00: Video record to show the progress on documentation system.
  - 13:30: Lunch.
  - 14:30: Back to work. Made a power converter EU -> US.
  - 15:30: Continue with the redesign of the documentation and development system.
  - 19:20:
  - Adopting Trello for the DMAIC team.
  - Analyzing the existing documentation platform.
  - Setting up a infinoted test service, installing the gobby client, show it to the team.


=CEB Press firmware=
==2014-08-26/09-03==
===CEB Press firmware===
  * Troubleshooting the CEB Press power-cubes using the [[Power_Cube_Failure_Modes_and_Troubleshooting]] and [[Power_Cube_Troubleshooting_Instructions]].
  * Set up the CEB Press test machine. The solenoids are licking.
  * Repairing the CEB Press test machine solenoids.
  * Preparing the CEB Press test controller board.
  * Firsts days testing the new code on the CEB Press test machine.
  * Successful test of the new firmware on the CEB Press v6 test machine.
  * https://github.com/jaqm/Open-CEB-Press
  * Last CEB Press firmware changelog:
    Changelog:
    - Removed the auto-calibration from test-mode.
    - Reimplemented the test mode.
    - The calibration is not being reseted in manual mode.
    - The shaker stops the machine completely and updates the timers properly to continue the cycle with no changes in the behaviour.
      A delay could happen depending on how long the solenoids take to actually start moving the cylinders.
    - in test mode, the timed mode buttons (down and left buttons) are disabled until the cylinders have been calibrated at least for
      the left movement and the down movement. this is  already happening in auto-mode when it goes into the failsafe stage or using
      the cylinder-bounce buttons [0] on test mode.
    - auto-mode: goes into the failsafe stage if the solenoids haven't being half-calibrated[1], if the solenoids have been already
      at least half-calibrated, it moves the drawer all the way right and goes directly to the close_chamber_stage to start pressing.
   
  [0] cylinder-bounce buttons: right and up buttons on test mode.
  [1] Solenoids Half-calibrated: The solenoids are considered half-calibrated if we have the complete travel time for the left and down movement.


2014-07-18 Friday:
===Power Cube===
------------------
   * Assemblying the power cube v7 and taking pictures.
  - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.
   * Helping in the Power Cube v7 documentation.
   - 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller.
   - 17:30-18:00: Visit to the Workshop.
  - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor's piece.


2014-07-19 Saturday:
===Miscellaneous===
--------------------
   * Configured the [[Octoprint_at_Factor_eFarm]] in the RaspbeeryPi at FactoreFarm.
   - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press' microcontroller code.  
   * The Raspberry Pi is now connecting to the "wireless" network through the wireless interface.
   - 14:30-16:30: Coding the CEB Press microcontroller.
   * Moving lumber to a better place.
   - 16:30-17:30: Helping out to take out some sand.
   * Making work the 3D Printer.
   - 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller.
  * Studying the steppers motors and stepper drivers used in the torch table.
  * Set up [[Infinoted]] on the Raspberry Pi that is running on the Wireless network at Factor eFarm.


2014-07-20 Sunday:
=Power Cube building=
--------------------
==2014-08-18/25==
   - Resting day.
===Power Cube===
  * Assemblying the Power Cube.
  * Cutting steel tubes.
  * Taken, filtered and uploaded a bunch of pictures to trovebox for powercube documentation.
===CEB Press===
  * Fixed the brick press production machine.
  * Assemblying and Fixing the brick press test machine.
  * Fixed the test controller board.
    - There was another pin that wasn't working.
    - The teensy and the fuse are broken.
    - Order a new Teensy for the Brick Press.
   * Tuning and solving bugs on the new CEB Press firmware.


2014-07-21 Monday
===3d Printing===
--------------------
   * Fixing the 3D-Printer, started to print little pieces for its self maintenance and improvement.
   - Brick press team. Moving the head of the machine.
  - Grinding and welding during the whole afternoon.


2014-07-22 Tuesday:
===Aluminum===
--------------------
   * Replacing the saw of the bendsaw.
   - Morning: Publicity team.
   * Cutting aluminum.
   - Afternoon: Workshop, handling steel bars for the Microhouse 3.


2014-07-23 Wednesday:
===Miscellaneous===
--------------------
  * Searching contact info of similar organizations to OSE to improve social networking.
   - The whole day: bending bars for the Microhouse 3.
  * Found a Raspberry Pi. Set it up and now it's working on the "wireless" network.
   - Some welding practice.
   * Moving some boards to the old workshop.
   * Covering the microhouse to protect it against rain.
  * Taking down a dom.
  * Taking pictures of the Composting toilet stairs building process.


2014-07-24 Thursday:
=2014-08-17=
--------------------
  * Devin's melting aluminum masterclass.
   - Morning: Moving soil for the Microhouse 3.
   * First test of the new firmware on the CEB Press.
   - Afternoon: Handling and measuring steel bars for the Microhouse.
   * Adding new features and solving bugs on the new CEB Press firmware.


2014-07-25 Friday:
=Post-MicroHouse Workshop=
  - Morning: Moving soil for the Microhouse 3.
==2014-08-15/16==
  - Afternoon: Writting the next version for the CEB Press.
   * Assembling a structure to cover the microhouse.
'''Git repository: https://github.com/jaqm/Open-CEB-Press'''
   * Making work the pool pump.
 
   * Group meeting.
2014-07-26 Saturday:
  - Resting day: relax, pool, more relax, some time writting code, more relax.
 
2014-07-27 Sunday:
  - The whole day: writting the firmware for the CEB Press.
  - Helping to move steel bars from the workshop to the microhouse.
 
2014-07-28 Monday:
  - Cleaning and reviewing the code for the CEB Press.
 
2014-07-29 Tuesday:
  * CEB Press firmware:
    - Review high pressure sensor flag support.
    - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.
  * Cutting wood and wires for the MicroHouse.
  * Dragging the pool to solve the licks.
 
2014-07-30 Wednesday:
  * CEB Press firmware:
    - going deep more into details of the auto-mode algorithm.
  * Fixing the licks of the pool.
 
2014-07-31 Thursday:
  * Seeting up the testing CEB Press.
  * Pressing some bricks in the production Brick press.
 
2014-08-01 Friday:
------------------
   * Built a picnic table.
  * Taking pictures of the Velocar workshop.
 
2014-08-02 Saturday:
------------------
   * Helping to print parts for the battery of the Velocar during the whole day and part of the evening.
 
2014-08-03 Sunday:
------------------
   * Baked some bread.


2014-08-04 Monday:
=Microhouse Workshop=
------------------
==2014-08-08/12==
  * Cleaning/organizing the buckets at the workshop.
  * Moving pallets and pieces of wood to cut.
  * Moving soil for the brick press.
 
2014-08-05 Tuesday:
-------------------
  * Mounting the rollers for the Brick Pressing "Factory".
  * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!
 
2014-08-06 Wednesday:
---------------------
  * Cutting, pressing, drilling bars for the doms.
 
2014-08-07 Thursday:
------------------
  * Mounting doms.
  * Preparing the Microhouse Workshop.
 
2014-08-08 Friday:
------------------
  * Microhouse workshop starts.
 
2014-08-09 Saturday:
------------------
   * Carpintery: building modules.
   * Carpintery: building modules.
   * Pressing bricks.
   * Pressing bricks.
2014-08-10 Sunday:
------------------
  * Carpintery: building modules for the Microhouse 3.
  * Pressing bricks.
2014-08-11 Monday:
------------------
   * Laying bricks.
   * Laying bricks.


2014-08-12 Tuesday:
=Microhouse 3 workshop preparation II=
------------------
==2014-08-04/07==
   * Last day of the workshop.
  * Mounting doms.
  * Cutting, pressing, drilling bars for the doms.
  * Mounting the rollers for the Brick Pressing line.
  * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!
  * Cleaning/organizing the buckets at the workshop.
  * Moving pallets and plywood to cut.
   * Moving soil for the brick press.


2014-08-13 Wednesday:
= Velocar Workshop=
------------------
==2014-08-01/03==
   * Day off.
  * Helping to 3D print parts for the battery of the Velocar during the whole day and part of the evening.
  * Taking pictures of the Velocar workshop.
  * Built a picnic table.
   * Baked some bread.


2014-08-14 Thursday:
=Microhouse 3 workshop preparation I=
------------------
  * Day off.


2014-08-15 Friday:
==2014-07-22/31==
------------------
* CEB Press:
   * Assembling a structure to cover the microhouse.
  - Seeting up the testing CEB Press.
   * Making work the pool pump.
  - Pressing some bricks in the production Brick press.
  - CEB Press firmware:
    - going deep more into details of the auto-mode algorithm.
  - CEB Press firmware:
    - Review high pressure sensor flag support.
    - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.
  - Cleaning and reviewing the code for the CEB Press.
  - Decide to fork and rewrite the current firmware development for the CEB Press.
    '''Git repository: https://github.com/jaqm/Open-CEB-Press'''
* Swimming Pool:
  - Fixing the licks of the pool.
* Microhouse 3 workshop preparation:
  - Cutting wood and wires.
  - Helping to move rebar.
  - Moving soil.
  - Handling and measuring rebar.
  - Bending rebar.
  - Some welding practice.
   - Publicity team.
   - Handling steel bars.


2014-08-16 Saturday:
=2014-07-21 Monday=
------------------
  - Brick press team. Moving the head of the machine.
   * Group meeting.
   - Grinding and welding during the whole afternoon.


2014-08-17 Sunday:
=2014-07-19=
------------------
  - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press' microcontroller code.  
  * Melting aluminum.
   - 14:30-16:30: Coding the CEB Press microcontroller.
   * First test of the new firmware on the CEB Press.
   - 16:30-17:30: Helping to take out some sand.
   * Adding new features and solving bugs on the new CEB Press firmware.
  - 17:30-20:00: Simplifying and fixing the Aidan's firmware of the CEB Press microcontroller.


2014-08-18 Monday:
=2014-07-18=
------------------
  - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.
  * Tuning and solving bugs on the new CEB Press firmware.
   - 14:30-17:30: Reviewing with Aidan the code of the CEB Press microcontroller.
   * Cutting steel tubes.
   - 17:30-18:00: First visit to the Workshop.
   * Cutting aluminum.
   - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor's piece.
   * Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.
  * Taking down a dom.


2014-08-19 Tuesday:
=2014-07-17=
------------------
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.
   * Uploading the pictures I took yesterday.
  - 10:00: Teamwork to redesign the OSE documentation system.
   * Searching contact info of similar organizations to OSE to improve social networking.
  - 13:00: Video record to show the progress on documentation system.
   * Replacing the saw of the bendsaw.
  - 13:30: Lunch.
  - 14:30: Back to work. Made a power converter EU -> US.
  - 15:30: Continue with the redesign of the documentation and development system.
  - 19:20:
   - Adopting Trello for the DMAIC team.
   - Analyzing the existing documentation platform.
   - Setting up a infinoted test service, installing the gobby client, show it to the team.


2014-08-20 Wednesday:
=2014-07-16 - Arrival=
---------------------
   - 19:00: Arrival to MCI airport.
   * Cutting aluminum.
   - 21:00: Arrival to Factor eFarm.
  * Fixing the 3D-Printer, started to print little pieces for its self-improvement.
   - 23:00: Sleep
 
2014-08-20 Thursday:
---------------------
  * Moving some boards to the old workshop.
   * Filtering and uploading pictures to trovebox fo the powercube documentation.
  * Found a Raspberry Pi. Set it up and now it's working on the "wireless" network.
  * Fixing the Brick Press. We didn't finished so we will tray again the next day if's possible.
 
2014-08-21 Friday:
---------------------
  * Rainy day.
  * Fixed the test controller board. There was another pin that wasn't working.
  * Improving and fixing a bug in the new brick press code.
  * Fixing the brick press.
  * Covering the microhouse to protect it against rain.
 
2014-08-21 Saturday:
---------------------
   * Fixing the brick press.
 
2014-08-22 Sunday:
---------------------
  * Fixing the brick press. The teensy and the fuse are broken.
  * Order a new Teensy for the Brick Press.
  * I finally publish the worklog.
 
2014-08-23 Monday:
---------------------
  * Assemblying the CEB Press testing machine.
  * Assemblying the Power Cube in progress.
 
2014-08-24 Tuesday:
---------------------
  * Making work the 3D Printer.
  * Studying the steppers motors and stepper drivers used in the torch table.
  * Set up [[Infinoted]] on the Raspberry Pi that is running on the Wireless network at Factor eFarm. Wrote the documentation related on this wiki.
 
2014-08-25 Wednesday:
---------------------
  * [[Infinoted]]
  * [[How_to_configure_Gobby_at_Factor_eFarm]]

Latest revision as of 12:14, 3 December 2016

Please post most recent entry on top

2014-09-04 - Departure

CEB Press firmware

2014-08-26/09-03

CEB Press firmware

 * Troubleshooting the CEB Press power-cubes using the Power_Cube_Failure_Modes_and_Troubleshooting and Power_Cube_Troubleshooting_Instructions.
 * Set up the CEB Press test machine. The solenoids are licking.
 * Repairing the CEB Press test machine solenoids.
 * Preparing the CEB Press test controller board.
 * Firsts days testing the new code on the CEB Press test machine.
 * Successful test of the new firmware on the CEB Press v6 test machine.
 * https://github.com/jaqm/Open-CEB-Press
 * Last CEB Press firmware changelog:
   Changelog:
   - Removed the auto-calibration from test-mode.
   - Reimplemented the test mode.
   - The calibration is not being reseted in manual mode.
   - The shaker stops the machine completely and updates the timers properly to continue the cycle with no changes in the behaviour.
     A delay could happen depending on how long the solenoids take to actually start moving the cylinders.
   - in test mode, the timed mode buttons (down and left buttons) are disabled until the cylinders have been calibrated at least for 
     the left movement and the down movement. this is  already happening in auto-mode when it goes into the failsafe stage or using 
     the cylinder-bounce buttons [0] on test mode.
   - auto-mode: goes into the failsafe stage if the solenoids haven't being half-calibrated[1], if the solenoids have been already 
     at least half-calibrated, it moves the drawer all the way right and goes directly to the close_chamber_stage to start pressing.
   
 [0] cylinder-bounce buttons: right and up buttons on test mode.
 [1] Solenoids Half-calibrated: The solenoids are considered half-calibrated if we have the complete travel time for the left and down movement.

Power Cube

 * Assemblying the power cube v7 and taking pictures.
 * Helping in the Power Cube v7 documentation.

Miscellaneous

 * Configured the Octoprint_at_Factor_eFarm in the RaspbeeryPi at FactoreFarm.
 * The Raspberry Pi is now connecting to the "wireless" network through the wireless interface.
 * Moving lumber to a better place.
 * Making work the 3D Printer.
 * Studying the steppers motors and stepper drivers used in the torch table.
 * Set up Infinoted on the Raspberry Pi that is running on the Wireless network at Factor eFarm.

Power Cube building

2014-08-18/25

Power Cube

 * Assemblying the Power Cube.
 * Cutting steel tubes.
 * Taken, filtered and uploaded a bunch of pictures to trovebox for powercube documentation.

CEB Press

 * Fixed the brick press production machine.
 * Assemblying and Fixing the brick press test machine.
 * Fixed the test controller board.
   - There was another pin that wasn't working.
   - The teensy and the fuse are broken.
   - Order a new Teensy for the Brick Press.
 * Tuning and solving bugs on the new CEB Press firmware.

3d Printing

 * Fixing the 3D-Printer, started to print little pieces for its self maintenance and improvement.

Aluminum

 * Replacing the saw of the bendsaw.
 * Cutting aluminum.

Miscellaneous

 * Searching contact info of similar organizations to OSE to improve social networking.
 * Found a Raspberry Pi. Set it up and now it's working on the "wireless" network.
 * Moving some boards to the old workshop.
 * Covering the microhouse to protect it against rain.
 * Taking down a dom.
 * Taking pictures of the Composting toilet stairs building process.

2014-08-17

 * Devin's melting aluminum masterclass.
 * First test of the new firmware on the CEB Press.
 * Adding new features and solving bugs on the new CEB Press firmware.

Post-MicroHouse Workshop

2014-08-15/16

 * Assembling a structure to cover the microhouse.
 * Making work the pool pump.
 * Group meeting.

Microhouse Workshop

2014-08-08/12

 * Carpintery: building modules.
 * Pressing bricks.
 * Laying bricks.

Microhouse 3 workshop preparation II

2014-08-04/07

 * Mounting doms.
 * Cutting, pressing, drilling bars for the doms.
 * Mounting the rollers for the Brick Pressing line.
 * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!
 * Cleaning/organizing the buckets at the workshop.
 * Moving pallets and plywood to cut.
 * Moving soil for the brick press.

Velocar Workshop

2014-08-01/03

 * Helping to 3D print parts for the battery of the Velocar during the whole day and part of the evening.
 * Taking pictures of the Velocar workshop.
 * Built a picnic table.
 * Baked some bread.

Microhouse 3 workshop preparation I

2014-07-22/31

* CEB Press:
 - Seeting up the testing CEB Press.
 - Pressing some bricks in the production Brick press.
 - CEB Press firmware:
   - going deep more into details of the auto-mode algorithm.
 - CEB Press firmware:
   - Review high pressure sensor flag support.
   - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.
 - Cleaning and reviewing the code for the CEB Press.
 - Decide to fork and rewrite the current firmware development for the CEB Press.
   Git repository: https://github.com/jaqm/Open-CEB-Press
* Swimming Pool:
 - Fixing the licks of the pool.
* Microhouse 3 workshop preparation:
 - Cutting wood and wires.
 - Helping to move rebar.
 - Moving soil.
 - Handling and measuring rebar.
 - Bending rebar.
 - Some welding practice.
 - Publicity team.
 - Handling steel bars.

2014-07-21 Monday

 - Brick press team. Moving the head of the machine.
 - Grinding and welding during the whole afternoon.

2014-07-19

 - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press' microcontroller code. 
 - 14:30-16:30: Coding the CEB Press microcontroller.
 - 16:30-17:30: Helping to take out some sand.
 - 17:30-20:00: Simplifying and fixing the Aidan's firmware of the CEB Press microcontroller.

2014-07-18

 - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.
 - 14:30-17:30: Reviewing with Aidan the code of the CEB Press microcontroller.
 - 17:30-18:00: First visit to the Workshop.
 - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor's piece.

2014-07-17

 - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.
 - 10:00: Teamwork to redesign the OSE documentation system.
 - 13:00: Video record to show the progress on documentation system.
 - 13:30: Lunch.
 - 14:30: Back to work. Made a power converter EU -> US.
 - 15:30: Continue with the redesign of the documentation and development system.
 - 19:20:
 - Adopting Trello for the DMAIC team.
 - Analyzing the existing documentation platform.
 - Setting up a infinoted test service, installing the gobby client, show it to the team.

2014-07-16 - Arrival

 - 19:00: Arrival to MCI airport.
 - 21:00: Arrival to Factor eFarm.
 - 23:00: Sleep