Ball Screw: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Added some more links under the "Useful Links" section)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
=Basics=
*A [[Lead Screw]] that Uses Ball Bearings to Reduce Friction
*$136 for 4 feet of 1" screw. 1/4" pitch - means fast travel. -[http://www.constructionknowledge.net/general_technical_knowledge/general_tech_basic_six_simple_machines.php]
*$136 for 4 feet of 1" screw. 1/4" pitch - means fast travel. -[http://www.constructionknowledge.net/general_technical_knowledge/general_tech_basic_six_simple_machines.php]


=calculations=
=calculations=
*425 oz in = 27 lb at inch or 54 at 1/2" of 1" shaft. Pitch of 1/4 inch means 12 mech adv or 650 lb of push minus inefficiencies.
*425 oz in = 27 lb at inch or 54 at 1/2" of 1" shaft. Pitch of 1/4 inch means 12 mech adv or 650 lb of push minus inefficiencies.
*what is torque limit of 1/2" ball screw?
*what is torque limit of 1/2" ball screw?
Line 10: Line 11:
*cast iron - $2.6/lb for 2" stock, 1x2 feet
*cast iron - $2.6/lb for 2" stock, 1x2 feet
*2"x8" is $1.6/lb -[http://www.speedymetals.com/pc-4185-8214-2-x-8-a-36-1020-hot-rolled-steel.aspx]
*2"x8" is $1.6/lb -[http://www.speedymetals.com/pc-4185-8214-2-x-8-a-36-1020-hot-rolled-steel.aspx]
=See Also=
*[[Open Source Ball Screw]]
=Useful Links=
*[https://en.wikipedia.org/wiki/Ball_screw The Wikipedia Page on Ball Screws]

Latest revision as of 16:57, 16 December 2019

Basics

  • A Lead Screw that Uses Ball Bearings to Reduce Friction
  • $136 for 4 feet of 1" screw. 1/4" pitch - means fast travel. -[1]

calculations

  • 425 oz in = 27 lb at inch or 54 at 1/2" of 1" shaft. Pitch of 1/4 inch means 12 mech adv or 650 lb of push minus inefficiencies.
  • what is torque limit of 1/2" ball screw?

Heavy Steel Slab

  • It is $3/lb for 10"x2' or 133 lb - [2]
  • cast iron - $2.6/lb for 2" stock, 1x2 feet
  • 2"x8" is $1.6/lb -[3]

See Also

Useful Links