Areas of Activity: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
Line 9: Line 9:
#Sales are the venues - website, Amazon, Etsy, Tindie, Ebay, Collaborative Marketing Sites
#Sales are the venues - website, Amazon, Etsy, Tindie, Ebay, Collaborative Marketing Sites
#Ongoing Crwodfunded Incentive Challenge enterprise model - has to assure marketing for crowdfunding, with delivery of realistic products; can be a pre-sale concept like Kickstarter, except with crowdfunded incentive prize. Set up a methodology for this, with collaboration of other [[Supercooperators]]. Products are placed in [[OSES]] as a viable product that can be delivered via on-demand, flexible fabrication. Requires enough import substitution that this is realistic with high T 3D printer, large printers, CNC torch table, and basic tools. We create the MVP microfactory this way. At the very least, a high T, or large 3D printer with filament maker infrastructure - is the MVP. This is because we get into large printing this way, into the area that routers could do with wood, except now our wood is free by going to waste feedstocks.
#Ongoing Crwodfunded Incentive Challenge enterprise model - has to assure marketing for crowdfunding, with delivery of realistic products; can be a pre-sale concept like Kickstarter, except with crowdfunded incentive prize. Set up a methodology for this, with collaboration of other [[Supercooperators]]. Products are placed in [[OSES]] as a viable product that can be delivered via on-demand, flexible fabrication. Requires enough import substitution that this is realistic with high T 3D printer, large printers, CNC torch table, and basic tools. We create the MVP microfactory this way. At the very least, a high T, or large 3D printer with filament maker infrastructure - is the MVP. This is because we get into large printing this way, into the area that routers could do with wood, except now our wood is free by going to waste feedstocks.
#Icons - should apply to the 500 modules, plus other processes and concepts - such as Team, Production Staff, Engineering. See [[Icons]].


=Schedule=
=Schedule=
[[MJ Schedule Notes]]
[[MJ Schedule Notes]]

Revision as of 16:02, 7 May 2020

Working Doc

[1]

Notes

  1. Icons are for modules, graphics, infographics, promo material, marketing material, OS Tech Pattern Language, working docs, also Fab Tool Icons
  2. Sales are the venues - website, Amazon, Etsy, Tindie, Ebay, Collaborative Marketing Sites
  3. Ongoing Crwodfunded Incentive Challenge enterprise model - has to assure marketing for crowdfunding, with delivery of realistic products; can be a pre-sale concept like Kickstarter, except with crowdfunded incentive prize. Set up a methodology for this, with collaboration of other Supercooperators. Products are placed in OSES as a viable product that can be delivered via on-demand, flexible fabrication. Requires enough import substitution that this is realistic with high T 3D printer, large printers, CNC torch table, and basic tools. We create the MVP microfactory this way. At the very least, a high T, or large 3D printer with filament maker infrastructure - is the MVP. This is because we get into large printing this way, into the area that routers could do with wood, except now our wood is free by going to waste feedstocks.
  4. Icons - should apply to the 500 modules, plus other processes and concepts - such as Team, Production Staff, Engineering. See Icons.

Schedule

MJ Schedule Notes