David Lemmer: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 16: | Line 16: | ||
*[[OSE Collaboration Protocol]] | *[[OSE Collaboration Protocol]] | ||
*[[OSE_Marketing]] - for recruiting collaborators. | *[[OSE_Marketing]] - for recruiting collaborators. | ||
*[[Seed Eco-Home]] - see [[Seed Eco-Home Index]] |
Revision as of 22:58, 14 July 2020
Tue Jul 14, 2020
- David Lemmer Log
- AFIT - Air Force Institute of Technology . Ohio.
- Systems Engineering Masters - model-based systems engineering. Systems engineering - before it used to be document based.
- Extreme_Enterprise_Event_Design#Pre-Preparation
- Start with Definition of Done
- Metrics - how do you measure if the process went well.
- Number of modules successfully produced
- Metric - number of people, and proper teams that showed up.
- Key thing in modular breakdown - map out the boundary - dimensions, inputs, outputs, where it's going. Specify only critical interfaces and properties.
- End up with a redundancy of solutions - of
- CAD in solid works
- Wiring and basics of circuit analysis. Used P-spice.
- OSE Part Library
- OSE Collaboration Protocol
- OSE_Marketing - for recruiting collaborators.
- Seed Eco-Home - see Seed Eco-Home Index