Basics
- This page goes over how one can sell (excess) power back to the Centralized Electric Grid
- Largely depends on the local legislation
- Also need a special meter in most cases
- Need to see SPECIFICALLY what hardware is needed
- Also need to see if there is a "cap" of maximum sellable amount of Kilowatt Hours
- Also can be done in a Vehicle-to-Grid setup (or perhaps a similar concept with dedicated on-site power storage)