Selling Power to the Grid: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Added some more information)
(Added an external link)
 
(7 intermediate revisions by the same user not shown)
Line 9: Line 9:


=Florida Use Case Analysis=
=Florida Use Case Analysis=
*
*[https://www.clayelectric.com/member-information/energy-information/common-questions-about-photovoltaic-systems-answered A Clay Electric Page Titled: "Common questions about photovoltaic systems answered" ]
*[https://www.clayelectric.com/member-information/energy-information/solar-power A Clay Electric Page Titled: "Solar Power" ]
*[https://www.jea.com/Environment/Distributed_Generation/ The JEA Page on Distributed Generation] (good pdf download for deep dive into info)
*[https://www.flaseia.org/education/solar-laws/customer-owned-renewable/ A FLASEIA Page titled "CUSTOMER-OWNED RENEWABLE GENERATION (Net Metering)" ]
*[https://www.clayelectric.com/sites/default/files/doc/net_metering.pdf Another Useful PDF]
*[http://www.floridapsc.com/library/filings/2019/08430-2019/08430-2019.pdf A Petition on This] (need to READ it, seems at surface level to be the electric companies not being fair on this?
 
==Important Info==
*The system shall be rated at no more than '''100 kilowatts''' (KW) alternating current power output"


=Internal Links=
=Internal Links=
*[[Net Metering]]
*[[Net Purchase and Sale (Energy) ]]
*[[Smart Grid]]
*[[Smart Grid]]
*[[OSE Grid Backup / Returning Power to the Grid Planning Log]]
*[[OSE Grid Backup / Returning Power to the Grid Planning Log]]

Latest revision as of 06:15, 4 September 2020

Basics

  • This page goes over how one can sell (excess) power back to the Centralized Electric Grid
  • Largely depends on the local legislation
  • Also need a special meter in most cases
  • Need to see SPECIFICALLY what hardware is needed
  • Also need to see if there is a "cap" of maximum sellable amount of Kilowatt Hours
  • Also can be done via power from a battery bank, or EV in Energy Storage as a Service systems
  • Supposedly Florida USA has one of the best systems in the USA for this?

Florida Use Case Analysis

Important Info

  • The system shall be rated at no more than 100 kilowatts (KW) alternating current power output"

Internal Links

External Links