Investment Construction Set: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "Based on study of industry standards, and corresponding breakthrough via OSE Modular Swarmability, we propose Extreme Enterprise seed funded at the level of $2M for a fin...")
(No difference)

Revision as of 17:03, 16 June 2022

Based on study of industry standards, and corresponding breakthrough via OSE Modular Swarmability, we propose Extreme Enterprise seed funded at the level of $2M for a finished product ecosystem. Basic cost structure is $100k management (incentive challenge organization), $100k reward, $100k materials, $100k collaborative literacy training development (software and documentation), $50k labor (fabricator-in-training), 6 person engineering team at $600k, $200k for manufacturing development (CNC torch, welding robot, any tools typical of the trade), and course startup for training 12 cohorts ($650k - 6 full time engineering-type professors). Risk factors: recruiting, addressed by maximum bootstrapping of apprentices-in-training - focusing on developing the talent. The question becomes - what delay times are typical for rapid training.