Logan Log: Difference between revisions
No edit summary |
No edit summary |
||
Line 4: | Line 4: | ||
{{RightTOC}} | {{RightTOC}} | ||
==Wed Jul 7, 2024== | |||
[[File:Seh2 wall 24.fcstd]] redid file types 1 and 3 to use 2x4 blocking and repositioned blocking to have it extend 1.5" below the 8' tall beadboard. This is for the 11.625" tall utility channel at the base of the wall. Added 4x8 OSB sheathing extended 1.5" below wall module to tie into 1st story ceiling joist. | |||
==Mon Jul 4, 2024== | ==Mon Jul 4, 2024== | ||
[[File:Seh2 wall 24.fcstd]] extended the wall height from 8' to 9' and created file types 1-3. Not sure how much to add to each wall module, and how far down should OSB extend? working from 11:30 to 16:15 with lunch, Instructions on [https://docs.google.com/presentation/d/18mEk_0SWzVIBJxdv6y1JuVsugYTZbgSbTLthTqycA8Y/edit?usp=sharing] | [[File:Seh2 wall 24.fcstd]] extended the wall height from 8' to 9' and created file types 1-3. Not sure how much to add to each wall module, and how far down should OSB extend? working from 11:30 to 16:15 with lunch, Instructions on [https://docs.google.com/presentation/d/18mEk_0SWzVIBJxdv6y1JuVsugYTZbgSbTLthTqycA8Y/edit?usp=sharing] |
Revision as of 02:43, 7 July 2022
Wed Jul 7, 2024
File:Seh2 wall 24.fcstd redid file types 1 and 3 to use 2x4 blocking and repositioned blocking to have it extend 1.5" below the 8' tall beadboard. This is for the 11.625" tall utility channel at the base of the wall. Added 4x8 OSB sheathing extended 1.5" below wall module to tie into 1st story ceiling joist.
Mon Jul 4, 2024
File:Seh2 wall 24.fcstd extended the wall height from 8' to 9' and created file types 1-3. Not sure how much to add to each wall module, and how far down should OSB extend? working from 11:30 to 16:15 with lunch, Instructions on [1]
Sun Sep 26, 2021
3D_Printed_Insulation, Modular_Construction
Summer X 2021
Aug 31 through Sep 14 Seed_Home_v3 build, Seed_Home_v2 stairs and some interior paneling
Wed Sep 02, 2021
Seed_Home_v3 SE3 wall module build
Wed Sep 01, 2021
Seed_Home_v3 SE3 concrete pour and misc build
Thu Jun 10, 2021
Mon Jun 7, 2021
Sun May 23, 2021
Mon Mar 22, 2021
Sun Feb 21, 2021
File:9footdoubledoor.FCStd, File:9footwall.FCStd
Sun Feb 14, 2021
FreeCAD Module Part List Generator
Thu Feb 11, 2021
FreeCAD Module Part List Generator