==Mon Jul 11, 2022==
[[File:Seh2 wall 26.fcstd]] working on changing to 9' studs. [https://docs.google.com/presentation/d/18mEk_0SWzVIBJxdv6y1JuVsugYTZbgSbTLthTqycA8Y/edit#slide=id.g13ca11495b0_0_0]
==Sun Jul 10, 2022==
[[File:Seh2_wall_25.fcstd]] changed design to 9' studs
[[File:Seh2_wall_25.fcstd]] changed design to 9' studs


==Wed Jul 7, 2024==
==Wed Jul 7, 2022==
[[File:Seh2 wall 24.fcstd]] redid file types 1 and 3 to use 2x4 blocking and repositioned blocking to have it extend 1.5" below the 8' tall beadboard. This is for the 11.625" tall utility channel at the base of the wall. Added 4x8 OSB sheathing extended 1.5" below wall module to tie into 1st story ceiling joist.
[[File:Seh2 wall 24.fcstd]] redid file types 1 and 3 to use 2x4 blocking and repositioned blocking to have it extend 1.5" below the 8' tall beadboard. This is for the 11.625" tall utility channel at the base of the wall. Added 4x8 OSB sheathing extended 1.5" below wall module to tie into 1st story ceiling joist.


==Mon Jul 4, 2024==
==Mon Jul 4, 2022==
[[File:Seh2 wall 24.fcstd]] extended the wall height from 8' to 9' and created file types 1-3. Not sure how much to add to each wall module, and how far down should OSB extend? working from 11:30 to 16:15 with lunch, Instructions on [https://docs.google.com/presentation/d/18mEk_0SWzVIBJxdv6y1JuVsugYTZbgSbTLthTqycA8Y/edit?usp=sharing]
[[File:Seh2 wall 24.fcstd]] extended the wall height from 8' to 9' and created file types 1-3. Not sure how much to add to each wall module, and how far down should OSB extend? working from 11:30 to 16:15 with lunch, Instructions on [https://docs.google.com/presentation/d/18mEk_0SWzVIBJxdv6y1JuVsugYTZbgSbTLthTqycA8Y/edit?usp=sharing]



Revision as of 01:51, 12 July 2022

User:Laloeb

Mon Jul 11, 2022

File:Seh2 wall 26.fcstd working on changing to 9' studs. [1]

Sun Jul 10, 2022

File:Seh2 wall 25.fcstd changed design to 9' studs

Wed Jul 7, 2022

File:Seh2 wall 24.fcstd redid file types 1 and 3 to use 2x4 blocking and repositioned blocking to have it extend 1.5" below the 8' tall beadboard. This is for the 11.625" tall utility channel at the base of the wall. Added 4x8 OSB sheathing extended 1.5" below wall module to tie into 1st story ceiling joist.

Mon Jul 4, 2022

File:Seh2 wall 24.fcstd extended the wall height from 8' to 9' and created file types 1-3. Not sure how much to add to each wall module, and how far down should OSB extend? working from 11:30 to 16:15 with lunch, Instructions on [2]

Sun Sep 26, 2021

3D_Printed_Insulation, Modular_Construction

Summer X 2021

Aug 31 through Sep 14 Seed_Home_v3 build, Seed_Home_v2 stairs and some interior paneling

Wed Sep 02, 2021

Seed_Home_v3 SE3 wall module build

Wed Sep 01, 2021

Seed_Home_v3 SE3 concrete pour and misc build

Thu Jun 10, 2021

Wall Module 5

Mon Jun 7, 2021

Wall Module 5

Sun May 23, 2021

Wall Module 2

Mon Mar 22, 2021

File:Rosebudplumbing.fcstd

Sun Feb 21, 2021

File:9footdoubledoor.FCStd, File:9footwall.FCStd

Sun Feb 14, 2021

FreeCAD Module Part List Generator

Thu Feb 11, 2021

FreeCAD Module Part List Generator

Mon Feb 8, 2021

File:9footmediumwindow.FCStd

Sun Feb 7, 2021

File:9footmediumwindow.FCStd

Thu Feb 4, 2021

File:8footwall.FCStd