Full Build Certification: Difference between revisions
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
|  (Created page with "#Grading land using open source heavy machines or equivalent. #Using and maintaining open source machines (tractor, backhoe, trencher, auger, cherrypicker, forks, power ladder...") | No edit summary | ||
| Line 2: | Line 2: | ||
| #Using and maintaining open source machines (tractor, backhoe, trencher, auger, cherrypicker, forks, power ladder, stump grinder, mulcher, mower) including the ability to use all the implements safely. | #Using and maintaining open source machines (tractor, backhoe, trencher, auger, cherrypicker, forks, power ladder, stump grinder, mulcher, mower) including the ability to use all the implements safely. | ||
| #Using and maintaining [[Power Cubes]] and replacing them on a machine for zero downtime. | #Using and maintaining [[Power Cubes]] and replacing them on a machine for zero downtime. | ||
| #Site evaluation, site soil testing, site surveying, and site GIS. Surveying and GIS training at collaborating community college. | #Site evaluation, site soil testing, site surveying, site aerial mapping, and site GIS. Surveying and GIS training at collaborating community college. | ||
| #Site grading with skid steering machine, and site excavation. | |||
| #Foundation marking and squaring. | |||
| #Foundation forms installation | |||
| #Foundation posthole augering | |||
| #Pre-foundation rough plumbing installation | |||
| #Concrete work including screeing, floating, troweling, and power trowelling. | |||
| #Installation of a frost protected footer. | |||
| #Sill plate installation | |||
| #Rough concrete polishing to 400 grit | |||
| #Exterior wall framing | |||
| #Exterior Door framing | |||
| #Exterior Window framing | |||
| #Exterior wall installation including doors and windows | |||
| #Top plate installation | |||
| #Floor joists installation | |||
| #Roof installation - main roof box | |||
| #Roof installation - rigig foam roof box | |||
| #EPDM installation on roof | |||
| #Door installation | |||
| #Interior door installation | |||
| #Door knob installation | |||
| #Deck framing and sheathing | |||
| #Deck installation | |||
| #House wrap installation | |||
| #Vinyl siding installation | |||
| #Deck EPDM installation | |||
| #Gutter installation, roof and deck | |||
| #Foundation skirt installation including plants | |||
| #Final landscaping with sod and tree plantings | |||
| #PV system installation | #PV system installation | ||
| #Power Trailer maintanance and usage for onsite temporary power | #Power Trailer maintanance and usage for onsite temporary power | ||
Revision as of 19:18, 24 July 2022
- Grading land using open source heavy machines or equivalent.
- Using and maintaining open source machines (tractor, backhoe, trencher, auger, cherrypicker, forks, power ladder, stump grinder, mulcher, mower) including the ability to use all the implements safely.
- Using and maintaining Power Cubes and replacing them on a machine for zero downtime.
- Site evaluation, site soil testing, site surveying, site aerial mapping, and site GIS. Surveying and GIS training at collaborating community college.
- Site grading with skid steering machine, and site excavation.
- Foundation marking and squaring.
- Foundation forms installation
- Foundation posthole augering
- Pre-foundation rough plumbing installation
- Concrete work including screeing, floating, troweling, and power trowelling.
- Installation of a frost protected footer.
- Sill plate installation
- Rough concrete polishing to 400 grit
- Exterior wall framing
- Exterior Door framing
- Exterior Window framing
- Exterior wall installation including doors and windows
- Top plate installation
- Floor joists installation
- Roof installation - main roof box
- Roof installation - rigig foam roof box
- EPDM installation on roof
- Door installation
- Interior door installation
- Door knob installation
- Deck framing and sheathing
- Deck installation
- House wrap installation
- Vinyl siding installation
- Deck EPDM installation
- Gutter installation, roof and deck
- Foundation skirt installation including plants
- Final landscaping with sod and tree plantings
- PV system installation
- Power Trailer maintanance and usage for onsite temporary power