Ukraine Reconstruction Program: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
=OSE Proposal= | |||
*10 CEB machines with soil mixers by end of 2023. Program fully up form first cohort of 24. | *10 CEB machines with soil mixers by end of 2023. Program fully up form first cohort of 24. | ||
*Crew of 240 crew leaders, with 6 crew leaders per house. Multiplies this by 4x capacity with local people and international volunteers. | *Crew of 240 crew leaders, with 6 crew leaders per house. Multiplies this by 4x capacity with local people and international volunteers. | ||
Line 12: | Line 14: | ||
*12 machines are $120k. | *12 machines are $120k. | ||
*Tractors, power cubes, and universal equipment comes in to play on [[Solar Construction Trailer]]. | *Tractors, power cubes, and universal equipment comes in to play on [[Solar Construction Trailer]]. | ||
=Russian Agreement= | |||
*Russia pays all reparations for war damage. | |||
*Reparations are used to rebuild Ukraine | |||
*Marshall-Plan equivalent is set up for Russia. OSE plays a role in reconstruction with 240 full time OSE people setting up OSE campuses in 100 locations | |||
*Psychological healing is started for [[Radical Man]] integration, towards [[Integrated Humans]] | |||
*Russia joins the West in liberating China, North Korea, Iran, and other thugs |
Latest revision as of 21:10, 6 August 2022
OSE Proposal
- 10 CEB machines with soil mixers by end of 2023. Program fully up form first cohort of 24.
- Crew of 240 crew leaders, with 6 crew leaders per house. Multiplies this by 4x capacity with local people and international volunteers.
- Capacity of 40 crews.
- USA operations provide cash flow and machine development
- Machines are utilized in Ukraine
- Output required - 500 sf grow home = 24*320 block. 8000 block per house. 500 block per hour - means 16 hours pressing/day, 2 shifts. House every 3 days. Enough block per house every day. 300 house capacity per year per machine, for 3000 houses with 10 CEBs.
- 40 crews - each crew does 100 houses per year. 4000 houses per year labor available.
- Now, how to scale this?
- More machines, more people.
- Electric power cubes - optimize for solar operation, 2 stage pumps. Some development there, needed for optimal pressing, likely 2-3x the throughput for the same energy.
- Same machines do more throughput - 6000 houses.
- 12 machines are $120k.
- Tractors, power cubes, and universal equipment comes in to play on Solar Construction Trailer.
Russian Agreement
- Russia pays all reparations for war damage.
- Reparations are used to rebuild Ukraine
- Marshall-Plan equivalent is set up for Russia. OSE plays a role in reconstruction with 240 full time OSE people setting up OSE campuses in 100 locations
- Psychological healing is started for Radical Man integration, towards Integrated Humans
- Russia joins the West in liberating China, North Korea, Iran, and other thugs