Line 8: | Line 8: | ||
#Boxes prewired - with device - so electrical is verified. Test devices - light sockets dangling and tested | #Boxes prewired - with device - so electrical is verified. Test devices - light sockets dangling and tested | ||
#Cabinets pre-cut. Big kitchen table pre-glued. Sink cutout for clamping. | #Cabinets pre-cut. Big kitchen table pre-glued. Sink cutout for clamping. | ||
[[Category: Open Building Institute]] [[Category: Seed Eco-Home]] |
Latest revision as of 02:56, 6 November 2022
- Attach joints - shark bite fittings, plumbing fittings, electrical boxes
- Pre-make assemblies for attachment - complete exposed shower side to loose holder, vent fan with wiring, CSED with breakers and knockout adapter; welded plumbing assemblies; water heater with fittings; water entrance; washer box, etc.
- Annotate modules - box locations with description, component labels
- Dingleassemblies - outlet box with coiled up wire of correct length, stapled next to box, flat so it doesn't stick out; cSEd premountes on wall module; plbingbattached spanning entire module ready for interconnect
- exterior boxes preattached with hole through wall and mount;
- Trim pre-painted
- Washer, heater, prewired and plumbed
- Boxes prewired - with device - so electrical is verified. Test devices - light sockets dangling and tested
- Cabinets pre-cut. Big kitchen table pre-glued. Sink cutout for clamping.