SEH in 5 Trailer Loads: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
(Added a Category to the Page)
 
(3 intermediate revisions by one other user not shown)
Line 1: Line 1:
=Loads=
#Foundation
#Foundation
#Floor 1 + subfloor + garage
#Floor 1 + subfloor + garage
Line 4: Line 6:
#Interior framing with MEP and Tubs + doors + exterior trim + siding
#Interior framing with MEP and Tubs + doors + exterior trim + siding
#Insulation + beadboard + flooring + interior trim
#Insulation + beadboard + flooring + interior trim
#Landscaping
#Landscaping, waste, water, electrical connection.
 
=Narrative=
Get inverter and solar up as soon as possible so that we have power. For the 240V input, use a 240V feed from a small inverter or use small gen with [[120-240 Transformer]]
 
[[Category: Logistics]] [[Category: Seed Eco-Home]]

Latest revision as of 22:56, 7 June 2023

Loads

  1. Foundation
  2. Floor 1 + subfloor + garage
  3. Floor 2 + roof + PV + House wrap
  4. Interior framing with MEP and Tubs + doors + exterior trim + siding
  5. Insulation + beadboard + flooring + interior trim
  6. Landscaping, waste, water, electrical connection.

Narrative

Get inverter and solar up as soon as possible so that we have power. For the 240V input, use a 240V feed from a small inverter or use small gen with 120-240 Transformer