Parallel Production Engineering: Difference between revisions
Jump to navigation
Jump to search
(Created page with "This is a document specifying procedure/timing of when different modules of the build are to occur. This must be based on: *Number of different modules *Completion time of eac...") |
m (Added a Category to the Page) |
||
(3 intermediate revisions by one other user not shown) | |||
Line 1: | Line 1: | ||
This is a document specifying | This is a document specifying the workflow/timing/layout ofthe production process to coordinate a modular build. The focus is on effective parallel coordination with a sizeable number of people within the context of swarm-based social production. | ||
This must be based on: | |||
*Number of different modules | *Number of different modules | ||
*Completion time of each module | *Completion time of each module | ||
Line 13: | Line 15: | ||
*Energy level and morale of the build team | *Energy level and morale of the build team | ||
*Amount of leadership, guidance, and automation available | *Amount of leadership, guidance, and automation available | ||
=Format= | |||
This should be a slide presentation with printouts for the production manager. Presentation should depict: | |||
*Which modules are being built when | |||
*What tools/techniques are used | |||
*Quality control steps required | |||
*Adjustment of timing based on contingencies | |||
*Treatment of individual modules and their assembly into a complete structure. | |||
[[Category: Production Engineering]] |
Latest revision as of 20:35, 17 August 2023
This is a document specifying the workflow/timing/layout ofthe production process to coordinate a modular build. The focus is on effective parallel coordination with a sizeable number of people within the context of swarm-based social production.
This must be based on:
- Number of different modules
- Completion time of each module
- Module complexity
- Number of people doing the build
- Tools available for the build and their condition
- Supplies available for the build
- Skill level of participants
- Infrastructure and facility access
- Safety during the build process
- Optimal timing during the day
- External factors such as weather. For example, in rainy whether, fetching supplies from outside may be an issue.
- Energy level and morale of the build team
- Amount of leadership, guidance, and automation available
Format
This should be a slide presentation with printouts for the production manager. Presentation should depict:
- Which modules are being built when
- What tools/techniques are used
- Quality control steps required
- Adjustment of timing based on contingencies
- Treatment of individual modules and their assembly into a complete structure.