Parallel Production Engineering: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "This is a document specifying procedure/timing of when different modules of the build are to occur. This must be based on: *Number of different modules *Completion time of eac...")
 
m (Added a Category to the Page)
 
(3 intermediate revisions by one other user not shown)
Line 1: Line 1:
This is a document specifying procedure/timing of when different modules of the build are to occur. This must be based on:
This is a document specifying the workflow/timing/layout ofthe production process to coordinate a modular build. The focus is on effective parallel coordination with a sizeable number of people within the context of swarm-based social production.
 
This must be based on:
*Number of different modules
*Number of different modules
*Completion time of each module
*Completion time of each module
Line 13: Line 15:
*Energy level and morale of the build team
*Energy level and morale of the build team
*Amount of leadership, guidance, and automation available
*Amount of leadership, guidance, and automation available
=Format=
This should be a slide presentation with printouts for the production manager. Presentation should depict:
*Which modules are being built when
*What tools/techniques are used
*Quality control steps required
*Adjustment of timing based on contingencies
*Treatment of individual modules and their assembly into a complete structure.
[[Category: Production Engineering]]

Latest revision as of 20:35, 17 August 2023

This is a document specifying the workflow/timing/layout ofthe production process to coordinate a modular build. The focus is on effective parallel coordination with a sizeable number of people within the context of swarm-based social production.

This must be based on:

  • Number of different modules
  • Completion time of each module
  • Module complexity
  • Number of people doing the build
  • Tools available for the build and their condition
  • Supplies available for the build
  • Skill level of participants
  • Infrastructure and facility access
  • Safety during the build process
  • Optimal timing during the day
  • External factors such as weather. For example, in rainy whether, fetching supplies from outside may be an issue.
  • Energy level and morale of the build team
  • Amount of leadership, guidance, and automation available

Format

This should be a slide presentation with printouts for the production manager. Presentation should depict:

  • Which modules are being built when
  • What tools/techniques are used
  • Quality control steps required
  • Adjustment of timing based on contingencies
  • Treatment of individual modules and their assembly into a complete structure.