2026 Board Meeting Presentation: Difference between revisions
Jump to navigation
Jump to search
(Created page with "*From Ronny to 1005 Sycamore BHHS - side by side. At 100 vs 180 k build cost for materials and labor, and 1/3 the labor cost. *From ist trac to decent looking to production skid steer at $25k sale price instead of $75k") |
No edit summary |
||
| (3 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
*From Ronny to 1005 Sycamore BHHS - side by side. At 100 vs 180 k build cost for materials and labor, and 1/3 the labor cost. | *From Ronny to 1005 Sycamore BHHS - side by side. At 100 vs 180 k build cost for materials and labor, and 1/3 the labor cost. Comically inefficient. Why doesn't it improve? Because at scale the designer (architect) does not design a house, and the user is not the builder (they are egged on by the builder for expensive (unbuildable) design). | ||
*From | *From 1st life trac to remote control production skid steer at $25k sale price instead of $90k for a commercial variant. | ||
*From metacrisis to Ethical hyperagents | |||
*FBA | |||
*BCC | |||
*Iconic CAD | |||
*Iconic Tech stack: Solar Breeder Construction Set (power + process, start with hydrogen, metal, concrete impacting [[Global Energy Use]]), Materials Construction Set (Kiln), TCS, 3DPCS. Resto of stack includes Site Design (all infra + integ ag), Greenhouse, Nursery, Biogas/Septic fertigation, Thermal Bat. | |||
Latest revision as of 20:16, 9 May 2026
- From Ronny to 1005 Sycamore BHHS - side by side. At 100 vs 180 k build cost for materials and labor, and 1/3 the labor cost. Comically inefficient. Why doesn't it improve? Because at scale the designer (architect) does not design a house, and the user is not the builder (they are egged on by the builder for expensive (unbuildable) design).
- From 1st life trac to remote control production skid steer at $25k sale price instead of $90k for a commercial variant.
- From metacrisis to Ethical hyperagents
- FBA
- BCC
- Iconic CAD
- Iconic Tech stack: Solar Breeder Construction Set (power + process, start with hydrogen, metal, concrete impacting Global Energy Use), Materials Construction Set (Kiln), TCS, 3DPCS. Resto of stack includes Site Design (all infra + integ ag), Greenhouse, Nursery, Biogas/Septic fertigation, Thermal Bat.