OSE Financial Transparency: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 52: Line 52:
**Nov. 3 - Penney's Concrete - $1988.32
**Nov. 3 - Penney's Concrete - $1988.32
**Nov. 3 - Jim Roberts, workshop slab, 2700 sf - $1146.00
**Nov. 3 - Jim Roberts, workshop slab, 2700 sf - $1146.00
**Total to Nov. 3 - $46,844.28
**Total to Nov. 3 - $46,744.28





Revision as of 18:15, 3 November 2011

Introduction

This page documents all charitable contributions received through the nonprofit side of Open Source Ecology, as well as any donations where the donor has explicitly requested that allocation should be reported.

Terra Foundation, a 501(c)(3) corporation organized in San Luis Obispo, California, USA, is acting as the fiscal sponsor for Open Source Ecology (OSE). OSE is thus able to process tax-deductible contributions from USA donors.

See also Terra Foundation Income and Balance Sheet

Log

  • Anonymous - Sep. 28, 1011 - $60k
    • Sep. 29, 2011 -Excavation and bulldozing, Workshop and HabLab, Duffy Reynolds Construction - $4k
    • Oct. 3, 2011 - Construction rebar, Sweiger - $3968.60
    • Oct. 3, 2011 - LifeTrac bucket prototype 1, Sweiger - $828
    • Oct. 3, 2011 - LifeTrac tracks chain for 3 tractors - $1046.97
    • Oct. 3, 2011 - metal, hydraulic coolers, welding supplies, 2 generators - $2786.39
    • Oct. 4, 2011 - foundation pads concrete, Payless Concrete - $821.28
    • Oct. 6, 2011 - HabLab step edge excavation correction - $437.50
    • Oct. 8, 2011 - 2 soil pulverizer Prototype 3s complete minus motors, bearings, and chain - $4006.18
    • Oct. 10, 2011 - mowing (280), raking (140), baling (220), 20 acres, for insulation - $640.00
    • Oct. 13, 2011 - 30" and 13"sawblades for Dimensional Sawmill prototype I, teeth, wrench - $1062.95
    • Oct. 14, 2011 - additional gravel for HabLab, 17 tons, Apac - $254.79
    • Oct. 14, 2011 - 9 + 6 cu yds concrete pour for HabLab walls, kitchen, bathroom, Payless Concrete - $1910.43
    • Oct. 14, 2011 - lumber for HabLab roof and framing - $2742.03
    • Oct. 14, 2011 - foundation form lumber, HabLab - $218.03
    • Oct. 14, 2011 - roof tiedown threaded rod and nuts, MoKan Fastener - $67.22
    • Oct. 14, 2011 - 5 hard hats - $52.18
    • Oct. 14, 2011 - PowerCube muffler studs and nuts - $57.54
    • Total Anonymous spending as of OCt 14 - $24,900.09
    • Oct. 17 - water pump fittings - $11.85
    • Oct. 24 - Bobcat conversion plate, Sweiger - $684.15
    • Oct. 17 - LifeTrac fuel - $64.50
    • Oct. 23 - Bobcat rental, month - $1690.00
    • Oct. 24 - Brick rollers, 60', Sweiger - $2296.90
    • Oct. 24 - Concrete supplies - $319.98
    • Oct. 24 - Torching and welding gas - $327.75
    • Oct. 24 - Bobcat fittings, thicker LifeTrac couplers, rebar tiedowns - $905.07
    • Oct. 25 - cement, lime, table saw, Tyvek from Menards - $1045.63
    • Total to Oct. 25 - $32,245.32
    • Oct. 27 - Jerry Hackett, brick laying - $140
    • Oct. 27 - Gene Hood, brick laying - $105
    • Oct. 28 - Regal plastic, glazing for HabLab and workshop - $4945.88
    • Oct. 31 - Skid Steer rental, RSC, John Deere 80 hp - $2400.58
    • Oct. 31 - Scaffolding, month rental - $457.95
    • Nov. 2 - Jim Roberts workshop slab preparation - $1142.00
    • Nov. 2 - Harbor Freight, CEB construction and masonry supply - $184.91
    • Nov. 3 - Penney's Conrete - $1988.32
    • Nov. 3 - Penney's Concrete - $1988.32
    • Nov. 3 - Jim Roberts, workshop slab, 2700 sf - $1146.00
    • Total to Nov. 3 - $46,744.28


  • Projected - workshop slab - $9k; Hablab roofing - $4k; ceiling - $4k; windows - $5k